Winfield Roller Gate RFI
W91237-26-Q1C5L
Department of the Army, W072 Endist Huntington. Fabricated Structural Metal Manufacturing.
Response deadline
August 24, 2026 at 12:00 PM EDT
Closed 23 days ago. Posted July 30, 2026, first published July 13, 2026. Scheduled to archive September 8, 2026.
Description
As published on SAM.gov.
This Request For Information Notice is intended to garner industry input for questions regarding Roller Gate Fabrication for the Winfiled Lock and Dam Located in Red House, West Virgina. Interested Contractors are encouraged to reply to the following questions after reviewing the Attached Technical Drawings:
1. Can the skin plate splices be performed using submerged arc welding?
2. Economies of scale: Are there significant efficiencies related to fabrication of 1 gate v 2 gates v 3 gates, etc.
3. Not grinding skin plate welds—What is the time and labor savings? Would not staggering skin plate splices increase efficiency/benefit fabrication? Note that splice welds would still be required to be ground flush at the intersections of longitudinal and transverse splice welds a minimum of 4” in all directions.
4. What factors do you consider when doing 100% RT on this quantity of welds? Shutting down shop? How is this cost factored in? What is the production rate? Cost per test?
5. Would a design featuring multiple pieces (2-4) with transverse gate splice(s) benefit fabrication? Would you prefer this splice be welded or bolted using slip critical bolted connection. Note that full assembly would be required at the shop prior to shipment for a full shop fit assembly.
6. Would a design featuring bolted on end shields and/or apron benefit fabrication/increase efficiency?
7. Would you be more or less likely to bid if this was a Construction Contractor (i.e. working with a prime contractor to install) vs a supply fabrication contract.
8. What can USACE do to reduce risk/contingency in bidding a project like this?
9. Are there connections that would be more cost efficient bolted instead of welded? Would it be more cost efficient to weld, or use slip critical bolts to connect splices on the skin plate(longitudinal and transverse)?
10. Are there a fabrication cost difference between bearing type and slip-critical bolted connections.
11. If final assembly of the gates is allowed in the field during installation, is this something that would be a benefit for fabrication/increase efficiency?
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- Ellec Robinetteellec.t.robinette@usace.army.mil304-399-5226
- Philip Davisphilip.s.davis@usace.army.mil304-399-5297
Also open from this buyer
- W91237-26-Q-A103 Title Evidence Services for Waldo, OHSolicitationSmall businessNAICS 541191W9123726QA103Closes tomorrowSep 17
- KRL Hydraulic Cylinder Inspection and RehabSolicitationSmall businessNAICS 811310W9123726QA101Closes in 2 daysSep 18
- W9123726QA100 - Bulkhead Crane Bus Rails Replacement at Captain Anthony Meldahl Locks and DamSolicitationNAICS 238210W9123726QA100Closes in 5 daysSep 21
- W9123726QA076 Service Barge 185 Drydocking and RepairsSolicitationSmall businessNAICS 336611W9123726QA076Closes in 5 daysSep 21
- W9123726QA079 Ohio/Kanawha Locks Repower and Repair of M/V Porter and M/V WorleySolicitationNAICS 336611W9123726QA079Closes in 6 daysSep 22