Solicitation, total small business set-aside
Paint Creek Gearbox Rebuild
W9123724Q0122
Department of the Army, W072 Endist Huntington. Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance.
Response deadline
September 3, 2024 at 1:00 PM EDT
Closed 789 days ago. Posted August 19, 2024, first published August 19, 2024. Scheduled to archive October 11, 2024.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2024
42 like it are open now in commercial and industrial machinery and equipment (except automotive and electronic) repair and maintenance
- 10th CAB Unit Maintained Equipment Maintenance
Department of the Army, W6QM Micc-Ft Drum
Combined synopsis and solicitation8(a)NAICS 811310Location not publishedW911S227QA007Closes in 4 daysNov 5 - Preventive and Corrective Maintenance for Ice Machines
Department of Veterans Affairs, 257-Network Contract Office 17
Combined synopsis and solicitationSDVOSBNAICS 811310Location not published36C25727Q0009Closes in 9 daysNov 10 - War Reserve Material (WRM) Equipment Maintenance Service
Department of the Army, 0411 Aq HQ Contract Aug
Sources soughtNAICS 811310Location not publishedW91QVN27RA992Closes in 10 daysNov 11
Description
As published on SAM.gov.
These specifications cover all work required to pick up, clean, inspect, rehabilitate, test, anddeliver one (1) right angle gearbox to Paint Creek Dam. The gearbox is a Litton Right Angle Gearboxwith Serial Number 3H-73650. Specifications for the gearbox are as follows:
Gear Ratio is 14.5:1, RPMinput is 1155, Output Torque is 4482, HP Rating is 6.37, and the Frame is U-40. Refer to drawingnumber O16b-UPC3-52.3 and the gearbox name plate for more information. The gearbox shall be rebuiltin accordance with the manufacturer?s recommendations to for the items listed below. All work shallconform to all applicable standards including AGMA 6001-E08 and AGMA 6013-A06.
The originalmanufacturer?s specifications shall be followed and documented for the required settings of bearinglaterals, gear backlash, gear tooth mesh and profiles, housing fits, housing continuity, critical dimensions,torque values, and proper operational parameters. The Contractor shall also be responsible fortransportation of the gearbox to and from their facility.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- BRADLEY ADKINSbradley.d.adkins@usace.army.mil3043995270