Solicitation, first published as presolicitation

Craney Island Eastward Expansion (CIEE) Pre-Dredging Phase 1C

W9123625B5002

Department of the Army, W2SD Endist Norfolk. Other Heavy and Civil Engineering Construction.

Awarded

Norfolk Dredging Company

$26,897,282.41 obligated so far on USAspending

Description

As published on SAM.gov.

Required work includes new work dredging by mechanical or bucket plant at the southeastern cell of the CIEE. The southeastern cell main dike footprint is being deepened to a required depth of -41 feet mean lower low water (MLLW). Also, the central and southern access channel footprints are being deepened to a required depth of -25 feet MLLW. Two feet of allowable over depth dredging will be part of the contract dredging pay prism for both the main dike and access channel footprints.

A main dike footprint not to exceed depth of -46 feet MLLW will be observed for this project. A central and southern access channel footprints not to exceed depth of -30 feet MLLW will be observed for this project. Material removed from the dike footprint will be received by ocean-going scows and placed at the Norfolk Ocean Disposal Site (NODS).

The scope requires a 3-year US Environmental Protection Agency USEPA Section 103 concurrence, and the estimated volume to be placed at NODS is 3-million cubic yards.The Contractor shall be responsible for the following:

dredging within the designated areas to the proposed and allowable pay depths, placing the removed material in ocean-going barges, transporting the ocean-going barges with the collected material to NODS, depositing the collected material at NODS, and communicating with the Port of Virginia maritime users to minimize impacts to vessel traffic and other dredging operations.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
HTVQLC41UCS9
CAGE
0E3M4
Vendor location
Chesapeake, VA
Contract
W9123625CA003, definitive contract
Obligated
$26,897,282.41
Actions
4 between March 6, 2025 and May 6, 2026
Competition
Full and Open Competition, 5 offers received
Set-aside reported
No Set Aside Used.
Described as
Craney Island Eastward Expansion Phase 1C. New Work Dredging by Mechanical or Bucket Plant at the Southeastern Cell of the Craney Island Dredge Material Management Area. Material Removed Will Be Placed at the Norfolk Ocean Disposal Site
Match
solicitation number W9123625B5002 equals the FPDS solicitation identifier; same awarding office W91236 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. November 29, 2024

    Presolicitation

    Due January 21, 2025 at 2:00 PM EST. SAM.gov, notice 8339e39f8d234e4a8a8175aa0063300e

  2. January 13, 2025

    Solicitation, originally presolicitation

    Due February 12, 2025 at 2:00 PM EST. SAM.gov, notice abfdb0b0ace74663a1d84daaa5cd1620

  3. February 6, 2025

    Solicitation

    Due February 12, 2025 at 2:00 PM EST. SAM.gov, notice 437aa5e4ef4f4656a2dd5a37c6d486a9

  4. February 7, 2025

    Solicitation

    Due February 12, 2025 at 2:00 PM EST. SAM.gov, notice e140c17da43a472f82afda1b6fcf25af

  5. February 18, 2025

    Solicitation

    Due February 12, 2025 at 2:00 PM EST. SAM.gov, notice cf4d3bd2bc5c4bc1884bb22d90ce78ea

  6. February 20, 2025

    Solicitation

    Due February 12, 2025 at 2:00 PM EST. SAM.gov, notice a5630bd9dbe943379bbbb35de65db1de

Points of contact