Sources sought
SOO LOCKS STANDBY GENERATOR AND DUCT BANK
W911XK24R0004
Department of the Army, W072 Endist Detroit. Commercial and Institutional Building Construction.
Response deadline
March 29, 2024 at 1:09 PM EDT
Closed 948 days ago. Posted March 15, 2024. Scheduled to archive April 13, 2024.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2024
185 like it are open now in commercial and institutional building construction
- JB Charleston Multiple Award Construction Contract
Department of the Air Force, FA4418 628 Cons PK
SolicitationNAICS 236220South CarolinaFA441826R0009Closes todayNov 2 - REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE RELATED TO SEVERAL UPCOMING PROJECTS at WRIGHT-PATTERSON AFB, OHIO
Department of the Army, W072 Endist Louisville
Sources soughtNAICS 236220Wright-Patterson AFB, OHWright-Patterson Air Force BaseW912QR26_RFI_CONSOLIDATEDPROJECTS_WPAFBCloses todayNov 2 - WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Department of the Air Force, FA8137 AFSC Pzioc
SolicitationWOSBNAICS 236220OklahomaFA813727R0002Closes todayNov 2
All 185 open in commercial and institutional building construction
Description
As published on SAM.gov.
Standby Generator System – The work includes construction of a new natural gas fueled back-up generator system along with removal of the existing back-up generators and associated diesel fuel storage and distribution system. The new generator system includes a new 5,400 square foot load bearing CMU and brick veneer building to house the generators, switchgear, and control equipment. This project provides reliable standby power to the Soo Locks Complex.
Duct Bank and Feeders - The work includes construction of new duct bank and manholes from Magazine Street Substation to a new manhole above Shaft #1 and new cable tray and supports within shaft 1 and the service tunnel to a splice point between Shafts #3 and #4. New feeders will be installed in this route and existing feeder cables will be demolished and removed. No cables that have been disconnected or are unused at the completion of the work shall be abandoned in place. This project replaces the existing unreliable feeders which have failed several times in the past.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 15, 2024
Sources sought
Due March 29, 2024 at 1:09 PM EDT. SAM.gov, notice 26322b980be6470b8ece888d8b99b4e0
Points of contact
- Dorretta J Calhoun-Battlesdorretta.j.calhoun-battles@usace.army.mil3132262719
- Stephanie M. CraigStephanie.M.Craig@usace.army.mil