Skip to content
  • 6,816 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Combined synopsis and solicitation, total small business set-aside

Rail Spanners

W911S226U3919

Department of the Army, W6QM Micc-Ft Drum. Railroad Rolling Stock Manufacturing.

Response deadline

August 14, 2026 at 2:00 PM EDT

Closed 78 days ago. Posted August 7, 2026. Scheduled to archive August 7, 2027.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2026

4 like it are open now in railroad rolling stock manufacturing

All 4 open in railroad rolling stock manufacturing

Description

As published on SAM.gov.

Minimum 72 inch long x 24 inch wide and no more than 4 inch thick. Minimum weight per single spanner 20,000lbs (40,000lbs per pair/axle) total weight minimum of each spanner is 78lbs EA. Rated capacity shall be no more than 50% of failure strength (at least a 2-to-1 safety factor). Failure strength is determined by the amount of weight that causes permanent deformation of the aluminum. Meaning that an 80,000 axle can be placed on a pair of spanners before any permanent deformation of aluminum appears. Minimum structure tubes 3 inch x3 inch and no more than 4 inch x4 inch. Top surface of spanner will be composed of maximum 2 inch wide high-traction rungs. The rungs shall be spaced no more than 4 inch to allow tiedown chains or straps to be routed between the rungs and over the structural tubes also spacing allows for debris to fall through. Must have reinforced kickplate on one side to rest on flat/ unobstructed surface. Minimum 12 inch heavy duty reinforced stub toe on each end: taper to 2 inch blunt end, knife end not acceptable, Each spanner must be etched with part number and capacity.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 7, 2026

    Combined synopsis and solicitation

    Due August 14, 2026 at 2:00 PM EDT. SAM.gov, notice ff683e1f161b41dda8d030566cb7d76b

    1 revisions on SAM
    • August 7, 2026: publish, combined synopsis and solicitation

Points of contact