Skip to content
  • 6,812 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Combined synopsis and solicitation, total small business set-aside

Pad-Mounted Transformer

W911S226U3773

Department of the Army, W6QM Micc-Ft Drum. Power, Distribution, and Specialty Transformer Manufacturing.

Response deadline

July 29, 2026 at 4:05 PM EDT

Closed 95 days ago. Posted July 22, 2026. Scheduled to archive July 22, 2027.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2026

52 like it are open now in power, distribution, and specialty transformer manufacturing

All 52 open in power, distribution, and specialty transformer manufacturing

Description

As published on SAM.gov.

Provide one Pad Mounted Transformer 750 kVA, 13.2 kV /208Y/120 V. Salient Characteristics: Furnish one (1) pad mounted, dead front, radial transformer, rated: ? Capacity: 750 kVA ? Phases: 3 ? Primary Voltage: 13,200 V (15 kV class) ?Secondary Voltage: 208Y/120 V ? Frequency: 60 Hz ? Phase: Three phase ? Cooling :ONAN ? Fluid: Mineral oil 2. Mandatory Physical Dimensions: The following dimensions are non negotiable: ? Height: 63?� inches (up to 64?� inches) ? Width: 65 inches ? Depth: May varies (existing is 41 inches) The Contractor shall confirm with proposal the manufacturing dimensions, either in writing or by a shop drawing, for government approval. 3. Mechanical and Construction Requirements: The transformer shall include: ?Stainless steel tank, cabinet and hardware (304) ? Dead front construction ? Pentahead security hardware ? ANSI 61 Grey color to match with existing enclosure ? Welded tank construction, sealed and pressure tested ? 1-inch Oil drain valve located on the primary side with 3/8-inch water sampler (required due to secondary side cable congestion) ? Arc-flash and safety labeling ? Lifting lugs and jacking pads ? Nameplate per ANSI C57.12.00 4.Electrical Requirements: ? Primary bushings: (6) 200 A load break wells with inserts for (3)LV and (3) 10KV arresters ? Secondary bushings: NEMA spade w/ supports terminals 10holes (3) LV and (1) neutral per ANSI ? Configuration: Radial Feed ? Impedance: Standard ANSI values for 750 kVA ? Taps: �2 x 2.5% (standard 5 position no load tap changer) 5.Protection and Monitoring: The transformer shall include: ? Bayonet fuse with isolation link? Current limiting fuses ? Load break switch (2 position minimum) ? Nitrogen pressure gauge, test port and blanket ? Temperature gauge ? Pressure vacuum gauge ? Liquid level indicator ? Schrader valve Note: All gauges must be visible. 6. Compliance Requirements: The transformer must comply with: ? ANSI/IEEE C57.12 series ? DOE 2016 efficiency standards ? National Electrical Safety Code (NESC) ? National Electrical Code (NEC /NFPA 70) ? UFGS 26 12 19 ? Pad Mounted, Liquid Filled, Medium Voltage Transformers ?American Buy Act ? PCB-free oil certification ? UL Listed 002. Provide Factory routine test Reports Results and documentation as minimum: ? Insulation resistance test ? Winding resistance test ? Turns ratio (TTR) ?Polarity and phase-relation test ? No-load and load-loss test ? Dielectric test ? Excitation test ?Impedance test ? Applied and Induced potential tests ? Leak Test ? Oil quality test (dielectric strength, moisture, interfacial tension) ? Certified As-built drawings ? Certified test report signed by manufacturer ? Installation and OM manuals ? Warranty documentation (minimum 1 year) ? Destination to the federal facility Fort Buchanan, Puerto Rico00934 ? ECD: 40 weeks ? Unit must arrive fully assembled and ready for installation ?Packing slip must include contract number, PO number, and serial number? Minimum 1 year manufacturer warranty covering defects in equipment.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 22, 2026

    Combined synopsis and solicitation

    Due July 29, 2026 at 4:05 PM EDT. SAM.gov, notice 6d4854cba1ee4d9b97f4c3b948aee2ca

    1 revisions on SAM
    • July 22, 2026: publish, combined synopsis and solicitation

Points of contact