Skip to content
  • 7,273 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Combined synopsis and solicitation, total small business set-aside

Hydraulic Power Unit

W911S225U1542

Department of the Army, W6QM Micc-Ft Drum. Fluid Power Pump and Motor Manufacturing.

Response deadline

August 19, 2025 at 4:00 PM EDT

Closed 443 days ago. Posted August 12, 2025. Scheduled to archive August 12, 2026.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2025

24 like it are open now in fluid power pump and motor manufacturing

  • VALVE,BYPASS

    Defense Logistics Agency, DLA Weapons Support

    Combined synopsis and solicitationNAICS 333996Anywhere in the USSPE7M127T1585
    Closes tomorrowNov 5
  • PUMP UNIT,CENTRIFUGAL

    Defense Logistics Agency, DLA Weapons Support

    Combined synopsis and solicitationSmall businessNAICS 333996Anywhere in the USSPE7M127T1497
    Closes tomorrowNov 5
  • PUMP,CENTRIFUGAL

    Defense Logistics Agency, DLA Weapons Support

    Combined synopsis and solicitationNAICS 333996Anywhere in the USSPE7M127T1524
    Closes tomorrowNov 5

All 24 open in fluid power pump and motor manufacturing

Description

As published on SAM.gov.

Aberdeen Dynamics 363493-1-HPU Hydraulic power unit or equivalent.a. The system shall meet all applicable OSHA standards and regulations.b. 150-gallon L shaped reservoir. c. HPU will consist of 40 HP electric Motord. Parker brand piston pump capable of producing 47 GPM @ 1110 PSI. e. 1.5 HP motor with circulation pump. f. Kidney Loop filter and coolerg. Return filter in reservoir, h. Soft start 480V panel, i. Temp and low-level indicatorj. Plumbed primarily with rubber hose and small amounts of stainless-steel tubing as needed. k. HPU to be painted grey. Proposal, Reviews, Drawings, Documentation, and Data1. Prior to AwardDETAILED DESCRIPTION REQUIRED PRIOR TO AWARD: MCAAP personnel will validate and verify/approve the offeror?s proposal before award is granted. To meet this review requirement, the offeror shall submit with their proposal a detailed technical description of each item. The offeror?s description submittal shall account for each one of the required product features located in this qualifying statement, and shall do so clearly, and in the same order as listed on this qualifying statement. The description shall also clearly portray/describe how each item will function. If qualifying on an ?equivalent? basis, proposal should list in detail where the proposed item is equivalent to the model/item requested and any ?non-equivalencies? must be explained. Enough information must be provided so that the government technical reviewer can verify equivalency. An offeror?s opinion that their product is ?equivalent? is not sufficient. Conceptual drawings that are not detail ?as built? drawings shall be provided as part of the detailed description. Drawing must provide overall height, width, and length dimensions. It shall depict the locations of key components to include base plate spacing and anchor pattern, hook height, overhead clearance, clearance span, and distance between columns. If there is a picture of the equipment or portions of the equipment, such as from a brochure, then that picture(s) should be included with the data. It is advantageous for the contractor to supply as much data as possible as the government will use this to approve the proposed equipment, as related to this purchase description, for production and/or purchase. Generic statements from the offeror stating they can provide the requested item DO NOT constitute a valid proposal.2. After Award ReviewsAfter an award, the contractor shall provide the government with, at minimum, a 30% progress/status update, a 60% progress/status update, a 90% progress/status update, and a notification when the item is shipped. If there are any unforeseen delays the government contract officer should be notified immediately. It is the sole purview of the MCAAP Engineering personnel to waive the necessity of these progress/status updates. The progress/status updates shall take the form of design reviews as necessitated by the procurement type and determined by government personnel. The design resign reviews shall have the minimum listed requirements below:3. Acceptance ReviewUpon shipment of components to MCAAP, an acceptance review by government personnel will be conducted. If the system or its components are found to be unacceptable, those components shall be shipped back to the contractor/manufacturer for repair and/or replacement. It is the sole purview of the MCAAP Engineering personnel to waive the necessity of these reviews.4. Finalized Drawings and DataThe contractor shall provide two (2) complete sets of as-built reproducible drawings/data. The drawings/data shall include, at minimum, the requirements of the paragraph above. One (1) complete hard copy set of finalized drawings/data shall be provided with the equipment. The other will be in electronic format. The format must be capable of being read as ?.dwg? or ?.dxf? for 2-D data and Solid Works (.sldprt, .sldasm) format or STEP (.stp) format for 3-D data. All drawings/data shall be authorized for reproduction and distribution to end users of the equipment.5. Operational, Maintenance, and Parts ManualsThe contractor shall furnish under this purchase description two (2) sets of operational, maintenance, and parts manuals as necessitated by the equipment. The manuals shall be specific (not canned statements about the system in general) to the system supplied. There shall be a brief description concerning the purpose of the specific equipment supplied and the rated operating capacities. The manuals shall contain a complete parts list to include (at minimum) all information necessary (manufacturer?s name, address, phone number, P/N, S/N, size, model number, type, etc.) to re-order the part if necessary. The manuals shall include all preventative maintenance procedures/schedules specific to the equipment supplied. These manuals shall be applicable to the equipment provided only and shall include all safety precautions/warnings associated with the operation. All manuals shall be authorized for reproduction and distribution to end users of the equipment. One (1) set of hard copy versions of the manuals shall be provided with the equipment. One (1) set of the manuals shall be electronic in form (on CD) and must be capable of being read in either a ?.pdf? or a ?.doc? format.Quality Assurance Provisions6. Responsibility for InspectionUnless otherwise specified in the contract or purchase description the contractor is responsible for the performance of all inspection requirements specified herein. Except as otherwise specified the contractor may use their own facilities or any commercial laboratory acceptable to the government. The government reserves the right to witness or separately perform any of the inspections set forth in the purchase description where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. The contractor shall notify the contracting officer at least 15 working days prior to shipment so a government representative(s) can make arrangements to be present to perform an acceptance inspection if necessary. Final acceptance of the contract shall be the responsibility of the government contracting officer.7. Quality ManagementContractor must show proof of internal quality management system in accordance with MIL-I-45208A, ISO 9001: 2000 or an equivalent quality assurance program. The contractor shall certify and maintain substantiating evidence that the product meets the provided drawing specification, and quality assurance requirements. This includes manufacture and welding requirements. The manufacturer may use their own inspection facility or any commercial facility agreeable to the government. The government reserves the right to witness the inspections of all components of this system for conformity of specifications.WarrantyContractor shall provide a warranty against defective material, parts, and workmanship for a period no less than 1 year from the final commissioning date.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 12, 2025

    Combined synopsis and solicitation

    Due August 19, 2025 at 4:00 PM EDT. SAM.gov, notice 726f5f8301564d2fbe4322a5c8266e7a

    1 revisions on SAM
    • August 12, 2025: publish, combined synopsis and solicitation

Points of contact