Skip to content
  • 8,082 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Sources sought, total small business set-aside

Climbing Tower Maintenance and Restoration

W911RZClimbingTowermaintenanceandRestoration

Department of the Army, W6QM Micc-Ft Carson. Commercial and Institutional Building Construction.

Response deadline

September 9, 2025 at 11:00 AM EDT

Closed 425 days ago. Posted September 5, 2025. Scheduled to archive September 24, 2025.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2025

189 like it are open now in commercial and institutional building construction

All 189 open in commercial and institutional building construction

Description

As published on SAM.gov.

THIS IS A SOURCES SOUGHT NOTICE REQUESTING INFORMATION IN SUPPORT OF THE FOLLOWING REQUIREMENT. This is NOT a Request for Proposal (RFP) or an announcement of a forthcoming solicitation. The Government is seeking information concerning the availability of capable contractors to provide:  

All resources and materials needed to execute climbing renovations and modifications. The contractor will warranty all work one year from date of completion and closeout. It will be the responsibility of the contractor to procure all materials, coordinate manpower, and conduct scheduling to ensure a timely completion per the agreed upon call order period of performance.  Period of Performance: 30 September 2025- 31 March 2026

5.1 Basic Services.  The Contractor shall provide services for all waste management ensuring it is properly disposed of off-site. The Contractor will always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.  The contractor will regrout and repaint structural steel base plates.  The contractor will clean and repaint all panel rebar hooks.  The contractor will  replace all missing, worn, or unserviceable t-nuts and corresponding anchor points.  The contractor will remove and repair all loose and delaminated concrete.  The contractor will patch all cracks properly routing out to ensure a clean and durable bond.  The contractor will paint and seal all repair areas identified (any abnormality in the climbing wall and/or structure as compared to original or intended state).  The contractor will patch and seal the top of the structure to cover exposed substructure and reduce water intrusion.  The contractor will repaint and seal the entire climbing wall.  The contractor will repaint and seal all portions of the primary steel structure with signs of flaking, corrosion, or damage.  Corrosion, cracks, and/or other abnormalities will be identified, removed, and structurally reinforced with appropriate welding and or fastening.  The contractor will scour and seal the existing concrete with textured sealant.   The contractor will adjust and orient all top rope and lead bolt hangars.  A load test will be performed to support intensive training loads and a safe and maximum load capacity reports will be generated for all existing anchor points.  The contractor will have the appropriate experience and credentialling to conduct climbing wall repairs of this scale. Lack of appropriate experience and/or credentialing will result in immediate termination.  It will be the responsibility of the contractor to procure all materials, coordinate manpower, and conduct scheduling to ensure a timely completion per the agreed upon period of performance.  The contractor, subcontractors, and all personnel associated with the project must have the appropriate access to Fort Carson and appropriate climbing wall restoration experience and/or credentialing.

 No contract will be awarded from this announcement. This source sought notice should not be construed as a commitment or authorization to incur costs in anticipation of such a procurement.  MICC Fort Carson is interested in obtaining responses from prospective contractors, but no contractor will be reimbursed for providing this information, therefore MICC-Ft. Carson will accept the requested information in whatever format it is provided. All information provided shall become property of the U.S. Army and will not be returned. Responses are requested by 0900 AM Mountain Standard Time on September 09, 2025.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. September 5, 2025

    Sources sought

    Due September 9, 2025 at 11:00 AM EDT. SAM.gov, notice df7e9f06c0a148c3a33611cad87a661e

    1 revisions on SAM
    • September 5, 2025: publish, sources sought

Points of contact