Skip to content
  • 6,813 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Sources sought, 8(a) sole source

FTG276 FPP Generator Control System (Brand Name Requirements)

W911KB26RA032

Department of the Army, W2SN Endist Alaska. All Other Miscellaneous Fabricated Metal Product Manufacturing.

Response deadline

September 9, 2026 at 6:00 PM EDT

Closed 53 days ago. Posted September 2, 2026, first published September 1, 2026. Scheduled to archive September 24, 2026.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed 53 days ago

61 like it are open now in all other miscellaneous fabricated metal product manufacturing

  • Hose Assembly, Nonmetallic

    Defense Logistics Agency, DLA Land and Maritime

    Presolicitation8(a)NAICS 332999Anywhere in the USSPE7MX26RX064
    Closes tomorrowNov 2
  • HOSE ASSEMBLY,NONMETAL

    Defense Logistics Agency, DLA Weapons Support

    Combined synopsis and solicitationSmall businessNAICS 332999Anywhere in the USSPE7M427T1635
    Closes in 2 daysNov 2
  • CONTROL ASSEMBLY,PUSH-

    Defense Logistics Agency, DLA Weapons Support

    Combined synopsis and solicitationSmall businessNAICS 332999Anywhere in the USSPE7L327T1128
    Closes in 2 daysNov 2

All 61 open in all other miscellaneous fabricated metal product manufacturing

Description

As published on SAM.gov.

SOURCES SOUGHT: THIS NOTICE IS MARKET RESEARCH TO SUPPORT INCLUSION OF SOLE SOURCE (BRAND NAME) SPECIFICATIONS IN A CONSTRUCTION PROJECT – FTG276 FPP GENERATOR CONTROL SYSTEM, FORT GREELY, ALASKA - AND IS NOT A REQUEST FOR PROPOSAL.


The U.S. Army Engineer District, Alaska intends to specify the below listed items as part of a larger construction contract to be executed on Fort Greely, Alaska. A determination by the Government to not compete this requirement, for the specific items listed below, based on the responses to this notice is solely within the discretion of the Government. Reference RFO 6.103-1(d), “Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements - Application for brand name descriptions.”

Items:

1. Cisco IE 3300 Network Switch.  The FPP Generator Control System will utilize the Cisco IE 3300 network switches for panel-mounted applications and all generator paralleling control components are required to communicate and integrate with the PCMS and PQMS head ends.

2. Basler DECS-250 Voltage Regulators. The FPP will utilize the Basler DECS-250 Voltage Regulators to provide voltage regulation for the diesel generators.

3. Caterpillar EMCP 4.2 Generator Controllers. The FPP will utilize the Caterpillar EMCP 4.2 Generator Controllers to provide control and monitoring of the existing Caterpillar diesel generators powering facilities.

4. Woodward DSLC-2-XT and MSLC-2-XT Generator Paralleling Control System. The FPP will utilize the Woodward DSLC-2-XT and MSLC-2-XT Generator Paralleling Control System to provide auto-synchronization and isochronous load sharing control for the five diesel generators and two utility feeders that provide power.  

5.  Emerson CEP001 Profinet I/O Devices and associated Rx3i Profinet Scanner Cards.  The FPP will utilize the Emerson CEP001 Profinet I/O Devices to replace the obsolete GE/Emerson Genius Block I/O devices in order to provide PCMS control and monitoring of medium voltage switchgear power facilities. 

6. Monico Mcore Secure Data Routers. The FPP will utilize the Monico Mcore Secure Data Routers as gateways to integrate the Caterpillar generator monitoring points to the PCMS system. 

7.  Red Lion DA50A gateways. The FPP will utilize the Red Lion DA50A gateways to integrate power equipment monitoring points to the PCMS system

8. SEL-751A protective relays. The FPP will utilize the SEL-751A protective relays will be installed in the FPP to replace existing obsolete protective relays use for synchronism check protection. These protective relays must communicate to SEL-3530 RTAC communications gateways and SEL head-end monitoring software. 

9. States 2FMS14-14QJ test blocks. The FPP will utilize the States 2FMS14-14QJ test blocks to test protective relays

THIS NOTICE IS A SOURCES SOUGHT NOTICE AND NOT A REQUEST FOR PROPOSAL. No solicitation will be available as these sole source items will be incorporated into the specifications of a FY26 solicitation for a construction project on Fort Greely, Alaska. Vendors who offer the above items which can meet all of the above functional criteria are invited to respond to this notice. Responses must include the following information:


1. Identification of the manufacturer’s name, address, and country of product manufacture.

2. Fully detailed specification sheets.

3. Narrative addressing how your product meets the salient features listed above.


Please send responses to mark.r.corn@usace.army.mil or catherine.williams@usace.army.mil

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. September 1, 2026

    Sources sought

    Cisco IE 3300 Network Switches (Brand Name)

    Due September 8, 2026 at 6:00 PM EDT. SAM.gov, notice 2ac9777a80a1406aa1ee1b0b330e2eba

    3 revisions on SAM
    • September 2, 2026: publish, sources sought
    • September 2, 2026: publish, sources sought
    • September 1, 2026: publish, sources sought
  2. September 2, 2026

    Special notice

    Balser DECS-250 Voltage Regulators (Brand Name)

    Due September 8, 2026 at 6:00 PM EDT. SAM.gov, notice 09c62cfe6dd040da946c690d358aeda7

    1 revisions on SAM
    • September 2, 2026: publish, special notice
  3. September 2, 2026

    Sources sought

    Due September 8, 2026 at 6:00 PM EDT. SAM.gov, notice 5d3119d09bca4f31ab7748aec654e600

    3 revisions on SAM
    • September 2, 2026: publish, sources sought
    • September 2, 2026: publish, sources sought
    • September 1, 2026: publish, sources sought
  4. September 2, 2026

    Sources sought

    Due September 9, 2026 at 6:00 PM EDT. SAM.gov, notice 9c8ca6157b0e4a868d159e6897204398

    3 revisions on SAM
    • September 2, 2026: publish, sources sought
    • September 2, 2026: publish, sources sought
    • September 1, 2026: publish, sources sought

Points of contact