Skip to content
Abierto

Combined synopsis and solicitation, total small business set-aside

Chena River Lakes Flood Control Project - Floor Drain Disposal

W911KB26QA012

Department of the Army, W2SN Endist Alaska. All Other Miscellaneous Waste Management Services.

Response deadline

August 24, 2026 at 2:00 PM EDT

Closed 23 days ago. Posted August 14, 2026, first published August 6, 2026. Scheduled to archive September 8, 2026.

Description

As published on SAM.gov.

SEE AMENDMENT 001 ATTACHED The Chena River Lakes Flood Control Project (Chena Project) has one shop floor holding tank that is not connected to a leach field and must be pumped to be emptied. The holding tank water will either be pumped directly from the shop floor holding tank or from plastic totes situated in the shop next to the drain in a heated space. The holding tank contents will be pumped, transported, and disposed under this contract.

The Chena Project is located 3800 Laurance Road, North Pole, Alaska, approximately 18 miles east of Fairbanks, Alaska. The Contractor shall furnish all labor, supervision, equipment, tools, parts and materials, as necessary, for the pumping and disposal of shop tank contents. Test results for the holding tank contents are shown in the Holding Tank Test Sample Analysis.

The Contractor is solely responsible for following any AKDEC and Federal regulations as they pertain to proper disposal of the holding tank contents. The contractor shall possess all required licenses and permits for transporting the holding tank contents. See RFQ for more details.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 6, 2026

    Combined synopsis and solicitation

    Due August 24, 2026 at 2:00 PM EDT. SAM.gov, notice df7b3ad9a60243f186267a0b84f58b50

  2. August 14, 2026

    Combined synopsis and solicitation

    Due August 24, 2026 at 2:00 PM EDT. SAM.gov, notice 55e484f52996405ab91c169bd325de4c

Points of contact