Presolicitation, total small business set-aside, first published as sources sought
FTG247 Replace UPS at IDT1, Fort Greely, Alaska
W911KB25R0032
Department of the Army, W2SN Endist Alaska. Power and Communication Line and Related Structures Construction.
Offers due
December 12, 2026 at 7:00 PM EST
41 days from now. Posted April 3, 2025, first published December 4, 2024.
Get an email when this is amended, when the deadline moves and when it is awarded.Watch it
Similar, open now
- Request for Quotations (RFQ) - Trenching, Underground Conduit Installation and Associated Civil Works
Department of State, American Consulate Cape Town
SolicitationNAICS 237130Outside the US19SF2027Q0001Closes tomorrowNov 3 - Power Construction and Services II (PCS II) MATOC
Department of the Army, W2SD Endist Philadelphia
SolicitationNAICS 237130Anywhere in the USW912BU26RA032Closes tomorrowNov 3 - CSSC Utility Feed Transformer Replacement
Department of the Army, W072 Endist Chicago
Sources soughtNAICS 237130IllinoisW912P627SSA001Closes in 3 daysNov 5
All 9 open in power and communication line and related structures construction
Description
As published on SAM.gov.
Presolicitation Notice
TITLE: FTG247 Replace UPS at IDT1, Fort Greely, Alaska
Identify set aside type
PSC Code: Y1BF – Construction of Missile System Facilities
NAICS Code: 237130 – Power and Communication Line and Related Structures Construction
Solicitation Number: W911KB25R0032
Description:
This is a pre-solicitation notice for a total small business set aside Request for Proposal (RFP) to replace the existing 80KVA Uninterruptable Power Systems (UPSs) with distributed redundant 75 Kilovolt-Ampere (KVA) UPSs. New UPS panelboards will be added to allow for redundant receptacles for all the mission equipment within the High-Altitude Electromagnetic Pulse (HEMP)-shielded equipment room. Emergency Power Off (EPO) will be upgraded to the latest MDA GMD standards. Power Control and Monitoring System (PCMS) and Power Quality Monitoring System (PQMS) will also be extended into IDT1 from the Fort Greely Power Plant (FPP).The estimated dollar magnitude of this project is anticipated between $1,000,000 and $5,000,000. The performance period will be approximately 540 calendar days. The procurement will be conducted using source selection procedures and the award will be based on best value tradeoff source selection procedures, considering the price and non-price factors cited in this announcement and the solicitation.
All Offerors must be registered in the System for Award Management (SAM) (https://www.sam.gov/SAM/). Joint ventures must be registered in SAM as the joint venture. Offerors are advised to begin this process when they prepare their proposal in order to ensure this registration is in place should they be selected for the award. Lack of registration in the SAM database will make an Offeror ineligible for award.
Anticipated NTP: 13 June 2025 with a 540 calendar-day period of performance; the Davis Bacon Act will apply.
(1) PROJECT INFORMATION: Replacethe existing 80KVA Uninterruptable Power Systems (UPSs) with distributed redundant 75 Kilovolt-Ampere (KVA) UPS at Fort Greely, Alaska.
(2) SELECTION CRITERIA: Evaluation criteria to be listed in the solicitation are anticipated to be:
Factor 1 – Past Performance (Confidence Assessment)
Factor 2 – Technical Approach
Factor 3 – Summary Milestone Schedule
Factor 4 – Price and Pro Forma Information
(3) OBTAINING THE SOLICITATION: The solicitation for this project will be provided in electronic format only and is currently scheduled to be available for download on or about 31 March 2025 at the PIEE Solicitation Module website at https://piee.eb.mil/sol/xhtml/unauth/index.xhtml via Solicitation number (W911KB25R0032). Any future amendments to the solicitation will also be available for download from this website. All responsible sources may submit an offer which will be considered by the agency. All notifications of changes to this solicitation shall be made through the internet only. It is the Offeror’s responsibility to check for any posted changes to this solicitation.
NOTE: Electronic proposal submissions will only be accepted via the PIEE Solicitation Module website at: https://piee.eb.mil/sol/xhtml/unauth/index.xhtml. IN ORDER TO SUBMIT A PROPOSAL, VENDORS MUST REGISTER IN THE PIEE SYSTEM AND MUST HAVE A PROPOSAL MANAGER ROLE ESTABLISHED. ADDITIONAL INFORMATION REGARDING PROPOSAL MANAGER, PROPOSAL MANAGER FUNCTIONS AND POSTING OFFERS CAN BE FOUD AT https//pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- B.01.03 Presolicitation notice.pdf105 KB, January 28, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
December 4, 2024
Sources sought
Due December 18, 2024 at 6:00 PM EST. SAM.gov, notice 7383f6dab45f44fb9077e0a4046ba5c3
January 28, 2025
Presolicitation
Due February 12, 2025 at 7:00 PM EST. SAM.gov, notice 6038379fd1af49f4a2f5d9aedded648b
2 revisions on SAM
- April 3, 2025: publish, presolicitation
- January 28, 2025: publish, presolicitation
April 3, 2025
Presolicitation
Due December 12, 2026 at 7:00 PM EST. SAM.gov, notice 36f58ccc19e04752854dc01f0af35015
2 revisions on SAM
- April 3, 2025: publish, presolicitation
- January 28, 2025: publish, presolicitation
Points of contact
- Brittney Morrisonbrittney.morrison@usace.army.mil
- Michelle Nelsenmichelle.nelsen@usace.army.mil9077532527