Combined synopsis and solicitation

Repair Fire Suppression System in WRM Warehouse Bldg#2462 and #2464, Osan AB (MATOC Work Plan)

W90VN6-24-R-0026

Department of the Army, 0906 Aq Co Contracting Bat. Commercial and Institutional Building Construction.

Response deadline

August 23, 2024 at 12:00 AM EDT

Closed 756 days ago. Posted July 22, 2024. Scheduled to archive September 7, 2024.

Description

As published on SAM.gov.

GENERAL: The work to be performed for completion of this Work Plan project shall be as described in general below. The contractor shall provide all labor, tools, equipment, supplies, and any other resources necessary to accomplish the scope of work contained herein and as included in the drawings and specifications. All work shall be completed IAW APPENDIX “A” As-built drawings, and APPENDIX “B” Specifications associated with this project.

Contract Type: This project is an individual Work Plan Task Order under the Multiple Award Task Order Contract (MATOC) issued by the 411th CSB, Korea. The definition of Work Plan is a task order in which the contractor must develop 100% plan and design, and provide all design drafting, management, supervision, plant, labor, materials, equipment, and any other resources necessary to complete this project based on the Government provided 30% of concept design and scope of work contained herein and as included in the as-built drawings and specifications. The task order proposal submission requirements are as below:

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 22, 2024

    Combined synopsis and solicitation

    Due August 23, 2024 at 12:00 AM EDT. SAM.gov, notice 8e8317dc25994acea767eeda9d4f1323