Skip to content
  • 6,837 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Solicitation

V250 AND TMS KIT

W58RGZ-25-Q-0016

Department of the Army, W6QK ACC-RSA. Other Aircraft Parts and Auxiliary Equipment Manufacturing.

Offers due

December 1, 2026 at 6:00 PM EST

29 days from now. Posted November 17, 2025.

Get an email when this is amended, when the deadline moves and when it is awarded.Watch it

Next from this buyer

Similar, open now

All 538 open in other aircraft parts and auxiliary equipment manufacturing

Description

As published on SAM.gov.

The Prototype Integration Facility (PIF), Combat Capabilities Development Command (DEVCOM) Aviation and Missile Center, Redstone Arsenal, Alabama, has a requirement to procure a Torque Measurement System to interoperate with a Variable-Geometry, Radial Outflow Compressor (VAROC) Air Dynamometer 250 and T408 aircraft engine in support of Flexible Engine Diagnostics Systems (FEDS).

Description of Required Supplies/Services:

Description

V250 / T408 Torque Measurement System Kit

The contractor shall provide the following with the TMS Kits:

  • TMS Module / Shaft to engine components: spline adapter and splined hub, if necessary.
  • TMS Plumbing
  • TMS Calibration Kit with weights
  • Electronics: Signal processor, Rotastat Control and 90 ft. cable

V250 Application Study for the T408 Aircraft Engine

The contractor shall evaluate the V250 Dynamometer with respect to testing objectives and configuration needs for testing the GE T408 Turboshaft Engine. The contractor shall define the specific interphase requirements with consideration to test plans, including inertia requirements, speeds, and power.

The following are deliverables as a result of this application study:

  • Special Rotor consideration for inertia requirements
  • Identifying the torque measurement equipment, including but not limited to torque meter, interconnect shafts, and electronics.
  • Upon determining appropriate torque meter system, CN will update or generate new drawings and documents and enable life solutions.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. November 17, 2025

    Solicitation, originally presolicitation

    Due December 1, 2026 at 6:00 PM EST. SAM.gov, notice 1382ddf28b4043f693446ab0ceba574b

    2 revisions on SAM
    • November 17, 2025: publish, solicitation
    • September 10, 2025: publish, presolicitation

Points of contact