Solicitation
13th ACSC Stratasys Origin Two and Stratasys F370CR 3D Printers
W56ZLW26Q0021
Department of the Army, 0418 Aq HQ Contracting Sup. All Other Industrial Machinery Manufacturing.
Response deadline
July 31, 2026 at 11:00 AM EDT
Closed 93 days ago. Posted July 29, 2026, first published July 29, 2026. Scheduled to archive August 15, 2026.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2026
5 like it are open now in all other industrial machinery manufacturing
- Prometheus Atomic Layer Deposition System
Department of the Navy, Naval Air Warfare Center
PresolicitationNAICS 333248Anywhere in the USN6893626SIMACQD550000E5500000441Closes in 2 daysNov 3 - Radia Paint Shakers
Department of the Army, W6QK ACC Anad
SolicitationNAICS 333248Anywhere in the USW911KF27QA007Closes in 8 daysNov 9 - HOIST,HOOK
Defense Logistics Agency, DLA Troop Support
Combined synopsis and solicitationSmall businessNAICS 333248Anywhere in the USSPE8EE27T0334Closes in 9 daysNov 9
Description
As published on SAM.gov.
This requirement is for a turnkey additive manufacturing solution to establish an organic capability for producing replacement parts at Fort Hood, TX. The acquisition includes two specific industrial-grade 3D printers, along with all necessary services for immediate and sustained operation:
- Stratasys Origin Two (Polymer Printer): An industrial-grade 3D printer utilizing programmable photopolymerization (P3/DLP) technology. It must have a minimum build volume of 192 mm x 108 mm x 370 mm and be capable of producing high-accuracy end-use parts with complex geometries
.- Stratasys F370CR (Composite-Ready Printer): An industrial-grade Fused Deposition Modeling (FDM) 3D printer specifically designed for producing composite parts. It must have a minimum build volume of 355 x 254 x 355 mm and be capable of printing with high-strength, carbon fiber-reinforced thermoplastics.
The requirement also includes turnkey installation, configuration, and calibration of all equipment; manufacturer led on-site training for operators; all necessary software licenses and initial consumables; and a comprehensive warranty and technical support package. Training shall be scheduled and conducted only after the printer has been fully installed, calibrated, and verified as operational. Training includes but not limited to system operation, job setup, maintenance, and troubleshooting.
All questions must be submitted in writing to the POCs listed below no later than 10:00 am (CST), 31 July 2026. komlan.e.dougah.mil@army.mil
austin.c.sanderson.mil@army.mil
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 3D Printer_RFO MFR_Limiting_Competition_under_SAT_Redacted.pdf512 KB, July 30, 2026
- Solicitation - W56ZLW26Q0021.pdf3.7 MB, July 29, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 29, 2026
Solicitation
Due July 31, 2026 at 11:00 AM EDT. SAM.gov, notice 22a32e87ab084957ab05717f1743d478
4 revisions on SAM
- July 30, 2026: publish, solicitation
- July 30, 2026: publish, solicitation
- July 30, 2026: publish, solicitation
- July 29, 2026: publish, solicitation
July 30, 2026
Solicitation
Due July 31, 2026 at 11:00 AM EDT. SAM.gov, notice 8b3b21aacd0e40949622caa35f22c490
4 revisions on SAM
- July 30, 2026: publish, solicitation
- July 30, 2026: publish, solicitation
- July 30, 2026: publish, solicitation
- July 29, 2026: publish, solicitation
July 30, 2026
Solicitation
Due July 31, 2026 at 11:00 AM EDT. SAM.gov, notice a63cbe9d21e44df284785757170bdb9e
4 revisions on SAM
- July 30, 2026: publish, solicitation
- July 30, 2026: publish, solicitation
- July 30, 2026: publish, solicitation
- July 29, 2026: publish, solicitation
Points of contact
- Komlan Dougahkomlan.e.dougah.mil@army.mil5206879528
- Austin Sandersonaustin.c.sanderson.mil@army.mil2542873301