Skip to content
Abierto

Award notice, total small business set-aside, first published as presolicitation

Repair King Drive - Grade and Pave

W519TC25RA012

Department of the Army, W6QK ACC-RI. Highway, Street, and Bridge Construction.

Awarded

Langman Construction Inc.

$1,653,050.00 on the award notice, August 21, 2025, contract W519TC25CA036

Description

As published on SAM.gov.

This project consists of the regrading and paving of King Drive from the intersection of Rodman Avenue and ending approximately 1,855 feet west of the Blunt Road intersection, on the Rock Island Arsenal, Rock Island, Illinois. The scope includes removing the existing Hot Mix Asphalt (HMA) pavement on King Drive according to the location mentioned above.

Removing the existing Portland Cement Concrete (P.C.C.) islands on Rodman Avenue adjacent to Building 187 and removing approximately 550 feet of the existing HMA trail adjacent to Rodman Avenue near the existing intersection of King Drive and Rodman Avenue. The project shall include relocating the intersection of King Drive and Rodman Avenue approximately 350 feet west.

A new exit lane shall be established on the west side of King Drive with the intent of campground vehicles and patrons to turnaround and exit the island. A new 10-foot HMA shared use path shall be established along the existing alignment of King Drive. The path shall terminate at Blunt Road. A portion of Blunt Road shall be reconstructed. The reconstruction shall begin at the intersection of King Drive and Blunt Road and terminate approximately 335 feet east of the intersection.

This project is being constructed in coordination with a future campground to be built later. The new road is intended to increase the mobility of larger vehicles in the area in relation to the campground.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
KYQ5AUK7TKP3
CAGE
0EB92
Vendor location
Rock Island, IL
Contract
W519TC25CA036, definitive contract
Obligated
$1,653,050.00
Actions
2 between August 21, 2025 and February 3, 2026
Competition
Full and Open Competition After Exclusion of Sources, 7 offers received
Set-aside reported
Small Business Set Aside - Total
Described as
This Project Consists of the Regrading and Paving of King Drive from the Intersection of Rodman Avenue and Ending Approximately 1,855 Feet West of the Blunt Road Intersection, on the Rock Island Arsenal, Rock Island, Il.
Match
award number W519TC25CA036 equals the contract number; same awarding office W519TC (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 5, 2025

    Presolicitation

    Due June 20, 2025 at 3:00 PM EDT. SAM.gov, notice a3dfeab0e7af4f77a24720fffdf38e40

  2. June 23, 2025

    Solicitation, originally presolicitation

    Due July 23, 2025 at 4:00 PM EDT. SAM.gov, notice 3a6cf899e09e4ba1a4e860615b4a0a11

  3. July 14, 2025

    Solicitation

    Due July 23, 2025 at 4:00 PM EDT. SAM.gov, notice e18337e89aa54121a8babaff3b9d7400

  4. July 22, 2025

    Solicitation

    Due July 30, 2025 at 4:00 PM EDT. SAM.gov, notice d17a9447531b437bb692609a325d282b

  5. July 29, 2025

    Solicitation

    Due July 30, 2025 at 4:00 PM EDT. SAM.gov, notice b77fc696e3a646af88c0c7a5780216a4

  6. September 16, 2025

    Award notice, originally solicitation

    Awarded to LANGMAN CONSTRUCTION Inc. Rock Island for $1,653,050. SAM.gov, notice 8bb8fdd4fbc34ce09e6ccbdbff8cbd08

Points of contact