Presolicitation, total small business set-aside
Repair Emergency Power, B720
W50S9726BA001
Department of the Army, W7N1 Uspfo Activity Tnang 118. Electrical Contractors and Other Wiring Installation Contractors.
Response deadline
August 27, 2026 at 2:00 PM EDT
Closed 66 days ago. Posted August 6, 2026, first published July 16, 2026. Scheduled to archive September 11, 2026.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2026
38 like it are open now in electrical contractors and other wiring installation contractors
- Edwards AFB Holiday Light & Decor Installation
Department of the Air Force, FA9301 Aftc Pzio
Closes tomorrowNov 2 - Generator Inspection Service and Routine Maintenance -
Department of Veterans Affairs, 246-Network Contracting Office 6
SolicitationSDVOSBNAICS 238210Virginia36C24627Q0090Closes tomorrowNov 2 - 692-21-101 CON NRM Improve Site Lighting and Lighting Controls for Energy Efficiency
Department of Veterans Affairs, 260-Network Contract Office 20
PresolicitationSDVOSBNAICS 238210White City, OR36C26027R0026Closes in 2 daysNov 3
All 38 open in electrical contractors and other wiring installation contractors
Description
As published on SAM.gov.
Invitation for Bids (IFB) Set-Aside for Small Businesses
SEE PIEE FOR W50S9726BA002 SOLICITATION: https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W50S9726BA002¬iceType=SolicitationNotice
NAICS Code: 238210 - Electrical Contractors and Other Wiring Installation Contractors
The Tennessee National Guard intends to issue an Invitation for Bids to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary for the repair the generator power system for Building 720 at Berry Field Air National Guard (ANG) Base, Nashville TN. The requirement involves the retrofitting of existing generators with paralleling equipment, the installation of a new generator docking station, and the extension of new and existing generator feeds. The contractor must tie the new connections into the automatic transfer switch panels. All work shall be in accordance with the SOW, construction plans, specifications, and applicable building codes. The contractor shall be responsible for providing temporary electrical power to Building 720 during any planned utility or generator outages to ensure 100% operational continuity of the 118th Wing’s missions.
The contract duration will be 120 calendar days after notice to proceed to include inspection and punch list. This project is set aside 100% for small businesses. The North American Industry Classification System (NAICS) Code is 238210, with a small business size standard of $19,000,000. The magnitude of construction is Between $250,000 and $500,000.
The tentative date for issuing the solicitation is on-or-about 24 July 2026. The tentative date for the pre-bid conference is on-or-about 13 August 2026, 1:00 P.M. local time, location to be provided in the solicitation. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the pre-bid conference. All questions for the pre-bid conference must be submitted by 7 August 2026 via email to gregory.allen.8@us.af.mil and jonathan.forren@us.af.mil.
The bid opening date is tentatively planned for on-or-about 27 August 2026. Actual dates and times will be identified in the solicitation. Interested offerors must be registered in the System for Award Management (SAM). To register go to www.SAM.gov. Instructions for registering are on the web page (there is no fee for registration).
The solicitation and associated information will be available only from the Contract Opportunities page at SAM.gov. Your attention is directed to FAR clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON
SUBCONTRACTING, which states “By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded”.
In accordance with RFO FAR 36.101-4, the following information is provided:
There are no agency-specific policies or procedures that apply to the definitization of equitable adjustments for change orders under construction contracts.
No data is available regarding the timely definitization of equitable adjustments for change orders under construction contracts
DISCLAIMER: The official plans and specifications are located on the official government webpage and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offeror’s responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible for various reasons. The Government is not responsible for any loss of Internet connectivity or for an offeror’s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 16, 2026
Presolicitation
Due August 27, 2026 at 2:00 PM EDT. SAM.gov, notice a5b7302d1a984224b25de04dd4d8e15f
3 revisions on SAM
- August 6, 2026: publish, presolicitation
- August 6, 2026: publish, presolicitation
- July 16, 2026: publish, presolicitation
August 6, 2026
Presolicitation
Due August 27, 2026 at 2:00 PM EDT. SAM.gov, notice 9ca492d329bf442b99399493fa9b685e
3 revisions on SAM
- August 6, 2026: publish, presolicitation
- August 6, 2026: publish, presolicitation
- July 16, 2026: publish, presolicitation
August 6, 2026
Presolicitation
Due August 27, 2026 at 2:00 PM EDT. SAM.gov, notice d933e383927d4009a9708d61c5e74286
3 revisions on SAM
- August 6, 2026: publish, presolicitation
- August 6, 2026: publish, presolicitation
- July 16, 2026: publish, presolicitation
Points of contact
- Greg Allengregory.allen.8@us.af.mil6156608890