Combined synopsis and solicitation, total small business set-aside
CS UPS & COOLING SYSTEM
W50S8W25Q0011
Department of the Army, W7N9 Uspfo Activity Wyang 153. All Other Miscellaneous Electrical Equipment and Component Manufacturing.
Response deadline
July 2, 2025 at 12:00 PM EDT
Closed 490 days ago. Posted June 2, 2025, first published June 2, 2025. Scheduled to archive July 17, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
58 like it are open now in all other miscellaneous electrical equipment and component manufacturing
- POWER SUPPLY
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationSmall businessNAICS 335999Anywhere in the USSPE7LX27U0308Closes tomorrowNov 4 - POWER SUPPLY
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationNAICS 335999Anywhere in the USSPE7LX27U0288Closes tomorrowNov 4 - POWER SUPPLY ASSY,A
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationNAICS 335999Anywhere in the USSPE7LX27U0290Closes tomorrowNov 4
All 58 open in all other miscellaneous electrical equipment and component manufacturing
Description
As published on SAM.gov.
The vendor shall provide un-installation of outdated equipment and installation of brand-new items according to acceptable standards.
Contractor shall provide Uninterruptible Power and Cooling Distribution Unit replacement/ installation and a Site Lead/Project Manager to provide the following critical tasks to support to the WYANG per the PWS. • 5.3.3 Capture existing cooling fluid/Re-fill system with cooling fluid. • 5.3.4 Demo existing piping • 5.3.5 Run new Pex piping to the in-row coolers. • 5.3.6 Furnish & install new 350A shut Trip Breaker with nema-1 Enclosure.
Tie existing EPO into new Shunt Trip breaker. • 5.3.7 Existing 3” Feeder conduit & wire fed from MDP will be shutdown & locked out. Intercept existing Feeder to line side of new 350A Shunt Trip Breaker/Enclosure.
Install Load side Feeder conduit & wire from new Shunt Trip Breaker to new UPS. • 5.3.8 Demo existing UPS, remove from Data Center, Dispose/recycle old UPS. • 5.3.9 Install Power Modules and Battery Cabinets • 5.3.10 Assume the existing structural integrity of raised floor is sufficient to move old UPS across floor & new UPS installed at old UPS location. All raised floor modifications by others.
SITE VISIT: 16 JUNE 2025 AT 0900 MDT at 217 Dell Rnage Blvd, Cheyenne, WY 82009 - IF NO REQUEST FOR SITE VISIT ARE RECIEVED BY 11 JUNE 2025 AT 1200 MDT, IT WILL BE CANCELED.
QUESTIONS DUE: 19 JUNE 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- Kristopher W Kahlekristopher.kahle@us.af.mil3077726884
- Christopher Davaloschristopher.davalos.1@us.af.mil3077726887