Solicitation, total small business set-aside

180th FW Lift Station Repair

W50S8S26QA009

Department of the Army, W7NU Uspfo Activity Ohang 180. Water and Sewer Line and Related Structures Construction.

Response deadline

June 8, 2026 at 4:00 PM EDT

Closed 101 days ago. Posted June 4, 2026, first published May 20, 2026. Scheduled to archive June 23, 2026.

Description

As published on SAM.gov.

DESCRIPTION: The contractor shall provide all management, tools, equipment, materials, labor, and supervision necessary to replace one submersible pump and one soft starter at the 180th Fighter Wing main lift station (ID: #3) located in Swanton, Ohio. All work shall be performed in strict accordance with the Performance Work Statement (PWS).

SCOPE OF WORK: The required services include, but are not limited to, the following:

Removal & Disposal: Safe removal and environmentally compliant disposal of the existing failed submersible pump and soft starter components.

Brand Name Installation: Procurement and installation of one (1) new Gorman-Rupp SF Series submersible pump (Model SFV4D). Procurement and installation of one (1) new Allen-Bradley soft starter (fully compatible, like-for-like replacement for the existing SMC Flex model).

Integration & Testing: Execution of all necessary NEC-compliant electrical wiring, system start-up, and operational testing to verify proper pump cycling, alternation, and overall system integration.

Deliverables: Provision of required submittals, including technical cut sheets, as-built drawings, and comprehensive Operation and Maintenance (O&M) manuals.

PERIOD OF PERFORMANCE: All work must be completed within 90 calendar days after the date of contract award.

CONTRACTOR RESPONSIBILITES: In accordance with the PWS and federal labor laws, the contractor is responsible for:

Labor Wages: Strictly adhering to the attached Department of Labor Wage Determination. All contractor and subcontractor personnel must be paid the applicable prevailing wages for this area and labor category.

Deliverables: Providing all necessary submittals, including technical cut sheets and O&M manuals.

Testing: Conducting full operational testing and start-up to verify system restoration.

Documentation: Ensuring as-built drawings are provided upon project completion. *See Attchments

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 20, 2026

    Solicitation

    Due June 8, 2026 at 4:00 PM EDT. SAM.gov, notice 5aa5e66aa5264bd28f17e73c8941f15e

  2. June 4, 2026

    Solicitation

    Due June 8, 2026 at 4:00 PM EDT. SAM.gov, notice cc2c46187f754b4d9e9205416d871cf8