Skip to content
  • 6,812 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Solicitation, total small business set-aside

W50S8126BA012

W50S8126BA012

Department of the Army, W7NE Uspfo Activity Maang 104. Power and Communication Line and Related Structures Construction.

Response deadline

September 29, 2026 at 2:00 AM EDT

Closed 33 days ago. Posted August 27, 2026. Scheduled to archive October 1, 2026.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed 33 days ago

10 like it are open now in power and communication line and related structures construction

All 10 open in power and communication line and related structures construction

Description

As published on SAM.gov.

THIS PROJECT REQUIRES ALL LABOR, TOOLS, EQUIPMENT, MATERIALS, TRANSPORTATION, ENGINEERING, AND SUPERVISION TO PERFORM UTILITY ROUTING FOR PROJECT AXQD242790, ALLIED SUPPORT SUNSHADES UTILITY INFRASTRUCTURE, AT 104 FW, BARNES ANGB, WESTFIELD, MA 01085. SCOPE: ESTABLISH A SECURE, REDUNDANT UNDERGROUND UTILITY CORRIDOR FOR 480V POWER AND OSP FIBER TO TWO TIE-IN POINTS. WORK INCLUDES APPROXIMATELY 800 LF OF HORIZONTAL DIRECTIONAL DRILLING, HDD, UNDER AIRFIELD PAVEMENTS AT MINIMUM 8 FT DEPTH; PRIMARY CIRCUIT TIE-IN SPLICING INTO 22.9KV BASE LOOP IN MANHOLE 110, EMH 110, WITH IEEE 386 200A ELBOWS; INSTALLATION OF ONE PAD-MOUNTED TRANSFORMER, 22.9KV PRIMARY TO 480Y/277V SECONDARY, 250KVA, ON FROST-PROTECTED CONCRETE PAD; BACKUP SYSTEM WITH 400A NEMA 3R MANUAL TRANSFER SWITCH AND CANNON PLUG RECEPTACLE; AND NEMA 3R/4X COMMUNICATIONS CABINET WITH FIBER PATCH PANELS. WORK ALSO INCLUDES AIRFIELD PAVEMENT RESTORATION, REMARKING PER UFC 3-260-04, PE-STAMPED LOAD STUDY, AND QUALITY LEVEL B SUE UTILITY SCAN. NAICS CODE 237130 APPLIES. MAGNITUDE IS BETWEEN $250,000 AND $500,000. A SINGLE-AWARD FFP CONTRACT IS CONTEMPLATED WITH A 90-CALENDAR-DAY POP. FAILURE TO BID ON ALL CLIN ITEMS RESULTS IN REJECTION. SOLICITATION, NOTICES, AND AMENDMENTS WILL BE POSTED AT HTTPS://PIEE.EB.MIL. SECURED PLANS INSTRUCTIONS ARE IN THE SOLICITATION. AWARD WILL BE MADE TO THE LOWEST RESPONSIVE BIDDER WHOSE BID CONFORMS TO THE INVITATION FOR BIDS.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 27, 2026

    Solicitation

    Due September 29, 2026 at 2:00 AM EDT. SAM.gov, notice 5c1f340589964e4fbdbd52627389ea26

    1 revisions on SAM
    • August 27, 2026: publish, solicitation

Points of contact