Presolicitation, first published as sources sought
Pre-solicitation/Synopsis Notice (25-R-0090): 5 Year IDIQ for Power Supply (NAICS 335931)
W31P4Q-25-R-0090
Department of the Army, W6QK ACC-RSA. Current-Carrying Wiring Device Manufacturing.
Response deadline
September 29, 2025 at 2:00 PM EDT
Closed 354 days ago. Posted September 12, 2025, first published July 21, 2025. Scheduled to archive October 14, 2025.
Description
As published on SAM.gov.
ATTENTION
ALL FORMAL COMMUNICATION RELATED TO THIS ACQUISITION MUST BE DIRECTED TO ATTN: CCAM-MLP Farrah Hammond, Contracting Specialist via email, farrah.t.hammond.civ@army.mil. No telephone requests will be accepted. Description The U.S. Government is conducting market research to identify vendors capable of the manufacture of Power Supply with National Stock Number (NSN) 6130-01-157-3155. This notice is issued solely for planning purposes and does not constitute a Request for Proposal (RFP).
The RFP will be issued on or about 30 September 2025. The anticipated acquisition will result in a 5-Year IDIQ, firm fixed price contract with an estimated minimum quantity of 30 units and a maximum of 150 units over the life of the contract applicable to the Patriot Weapon System (D6). In order to obtain access to the Technical Data Package (TD), venders must have an active certification in Joint Certification Program (JCP), https://www.public.dacs.dla.mil/jcp/ext/#ext/dashboard.
SCOPE OF REQUIREMENT Noun: Power Supply Restricted to Advanced Conversion Technology, Inc. (Cage Code: 60642)
NSN:
6130-01-157-3155 Part Number:
11436849-2 PRON:
D15H0865D1 Quantity Range: Minimum 30 units / Maximum 150 units over the ordering periods TDP:
Government Owned (Source Approval)* Requirement: Contractor’s First Article Testing (FAT) *Source Approval Request (SAR): Parties must submit a SAR package in accordance with Army SAR guidelines for evaluation and potential qualification.
AMC/AMSC:
3C: This part requires engineering source approval by the design control activity in order to maintain the quality of the part. Existing unique design capability, engineering skills, and manufacturing knowledge by the qualified source(s) require acquisition of the part from the approved source(s). The approved source(s) retain data rights, manufacturing knowledge, or technical data that are not economically available to the Government, and the data or knowledge is essential to maintaining the quality of the part.
An alternate source must qualify in accordance with the design control activity's procedures, as approved by the cognizant Government engineering activity. The qualification procedures must be approved by the Government engineering activity having jurisdiction over the part in the intended application. F.O.B. Destination with delivery to the address below.
SR W0H9 US ARMY AVN & MISSLES CMD AMCOM FLEET MGT CENTER AFMC HOLBROOK RD BLDG 722 FORT BLISS, TX, 79916-5801 RESPONSE INSTRUCTIONS Interested parties shall submit a capabilities statement, not to exceed 10 pages, that includes:
1. Company Name, Address, and CAGE Code 2. Point of Contact Name, Phone Number, and Email Address 3. Business Size and Socioeconomic Status under NAICS 335999 4. Technical Capability to Manufacture the Item Experience with source-controlled and military-grade components Access to or ability to obtain the required technical data package Demonstrated experience with First Article Testing (FAT) 5. Relevant Past Performance on Similar Items 6. Production Capacity and IDIQ Support Capability 7. Source Approval Request (SAR): Guidance is available at: https://www.avmc.army.mil/Directorates/SRD/TechDataMgmt/ Submit all responses via email to:
Farrah Hammond at Farrah.t.hammond.civ@army.mil Subject Line: "Response to Pre-solicitation/Synopsis Notice W31P4Q-25-R-0090– Power Supply” Deadline for submission: September 29, 2025 at 1:00 pm CST.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 21, 2025
Sources sought
Sources Sought Notice (25-R-0090): 5 Year IDIQ for Power Supply (NAICS 335999)
Due August 8, 2025 at 6:00 PM EDT. SAM.gov, notice 6f351c2f89914b779d8ccf22c44e6b59
September 2, 2025
Sources sought
Sources Sought Notice (25-R-0090): 5 Year IDIQ for Power Supply (NAICS 335931))
Due September 12, 2025 at 6:00 PM EDT. SAM.gov, notice 1435ad5548ba4be4b18904284dc1db74
September 2, 2025
Sources sought
Sources Sought Notice (25-R-0090): 5 Year IDIQ for Power Supply (NAICS 335999)
Due September 12, 2025 at 6:00 PM EDT. SAM.gov, notice b2a940f16bf44c8e8d40f4137d8f03bc
September 12, 2025
Presolicitation, originally sources sought
Due September 29, 2025 at 2:00 PM EDT. SAM.gov, notice 7e5714fed3c24675803241135b64c606
Points of contact
- Farrah Hammondfarrah.t.hammond.civ@army.mil
- Delvin Sullivandelvin.l.sullivan.civ@army.mil
Also open from this buyer
- REQUEST FOR INFORMATION (RFI) Fair Share Sustainment Operations (FSSO) HAWK Missile System.Sources soughtNAICS 336419Redstone Arsenal, ALW314Q-R-27-A046Closes todaySep 18
- Integrated Air and Missile Defense (IAMD) Battle Command System (IBCS) Ground Systems Maintenance and Optimization (GSM&O) IIPresolicitationNAICS 541330Grand Prairie, TXW31P4Q-27-F-A001Closes in 5 daysSep 23
- CSO - U.S. Army Aviation TrainingCombined synopsis and solicitationNAICS 611512AlabamaW9113M-25-S-C006Closes in 12 daysSep 30
- SUPPLY CHAIN OPTIMIZATION SUPPORT (SCOS) SolicitationCombined synopsis and solicitationSDVOSBNAICS 541614Redstone Arsenal, ALW31P4Q26RA002Closes in 14 daysOct 2