Sources sought, total small business set-aside
TSS Ductless System Installation at EWR ATCT (Newark, N.J.)
TSS_Ductless_System_Installation_EWR_ATCT
Federal Aviation Administration, 697DCK Regional Acquisitions SVCS. Plumbing, Heating, and Air-Conditioning Contractors.
Response deadline
December 1, 2025 at 1:00 PM EST
Closed 341 days ago. Posted November 17, 2025. Scheduled to archive December 16, 2025.
Get the next one like this from Federal Aviation Administration by email, the day it is posted.Find my opportunities
This one closed in 2025
45 like it are open now in plumbing, heating, and air-conditioning contractors
- CGC SCIOTO WATER MIST FIRE PROTECTION SYSTEM
US Coast Guard, Cg-Sea-C22
Combined synopsis and solicitationSmall businessNAICS 238220Keokuk, IA70ZU0227Q0000282Closes in 2 daysNov 9 - B41 Isolation Valve Installation
Department of Veterans Affairs, 256-Network Contract Office 16
Combined synopsis and solicitationSDVOSBNAICS 238220North Little Rock, AR36C25627Q0081Closes in 2 daysNov 9 - NEW - Energy Center Steam Header& Boilers valves, gaskets, and vent replacement
Department of Veterans Affairs, 257-Network Contract Office 17
Sources soughtSDVOSBNAICS 238220Dallas, TX36C25727Q0078Closes in 2 daysNov 9
All 45 open in plumbing, heating, and air-conditioning contractors
Description
As published on SAM.gov.
Mechanical
- Install (3) indoor wall-mounted units, along with all refrigerant and drain piping.
- Install (1) 6-ton heat pump. Unit to be anchored to exterior concrete wall via on L-bracket steel frame.
- Coordinate core penetrations through concrete wall for piping, electrical, and drain lines. Installation to include all wall waterproofing.
- Provide and insulate all refrigerants and condensate piping above ceiling
- Test and charge system to verify operation.
Electrical
- Install new dedicated 208V, 3-phase power circuit
- Provide NEMA 4X, 60A non-fused stainless steel disconnect at outdoor unit
- Provide power and control conduit and wiring to/from all units
- Penetrate concrete wall.
- Provide penetration and conduit through roof deck. Patch and flash roof as required to maintain new roof warranty through Carlisle Roof installer.
Controls
- Integrate mini-split system into the existing FAA Schneider Electric EcoStruxure DDC system via BACnet
- Provide and install one IP-IO module at VAV-17 for coordinated backup cooling enable/disable
- Submit point list, graphics, and control narrative to COR for approval.
- Program unit set points, and update AHU-3 supply air setpoints
- Support commissioning of system to validate operation.
Structural & Interior
- Concrete core penetration for pipes and conduits
- Provide support framing for all units and steel plates as shown in drawing.
- Provide support for pipes and conduits.
- Work to include wall restoration and painting.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- TSS DUCLESS SYSTEM SOW.docx36 KB, November 17, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
November 17, 2025
Sources sought
Due December 1, 2025 at 1:00 PM EST. SAM.gov, notice dd76cdcdaf064a68909e4517d7782a51
1 revisions on SAM
- November 17, 2025: publish, sources sought
Points of contact
- Elisha Distlerelisha.distler@faa.gov8172224196