Skip to content
Abierto

Sources sought

B-2 Supply Chain Velocity Initiative

SSS6MAY2026

Department of the Air Force, FA8110 AFLCMC WBK-2 B-2.

Response deadline

May 11, 2026 at 10:00 AM EDT

Closed 128 days ago. Posted May 7, 2026, first published May 6, 2026. Scheduled to archive May 13, 2026.

Description

As published on SAM.gov.

The Air Force Life Cycle Management Center (AFLCMC) is conducting market research to identify sources capable of serving as a neutral, program-controlled integrator to address parts obsolescence and regenerate the B-2 Spirit bomber supply chain through reverse engineering and technical data package (TDP) development.

Viable respondents must be established defense contractors possessing demonstrated integration experience for low-density strategic aircraft fleets, extensive in-house reverse engineering expertise, and specialized SAP-cleared facilities capable of accommodating multiple large-body aircraft.

Due to inherent Organizational Conflicts of Interest (OCI) with this specific effort, the B-2 Original Equipment Manufacturers (OEMs) and their primary mission-system affiliates shall not be considered for award and should NOT respond to this notice. Potential vendors should review the attached document and submit a capability statement if, and only if, they possess verifiable evidence of meeting every mandatory qualification and the infrastructure requirements outlined in the synopsis.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 6, 2026

    Sources sought

    Due May 11, 2026 at 10:00 AM EDT. SAM.gov, notice 515111ee86054640b5f2941969a2cbea

  2. May 7, 2026

    Sources sought

    Due May 11, 2026 at 10:00 AM EDT. SAM.gov, notice afea5704a3304a81acb092f11167ea13

Points of contact