Skip to content
Abierto

Sources sought

DC Power Supply Cable

SS_Power_Supply_Cable

Department of Energy, Brookhaven Natl Lab -Doe Contractor.

Response deadline

June 21, 2024 at 5:00 PM EDT

Closed 818 days ago. Posted June 13, 2024. Scheduled to archive July 6, 2024.

Description

As published on SAM.gov.

THIS IS A SOURCES SOUGHT NOTICE ONLY. THIS IS NOT A FORMAL REQUEST FOR PROPOSAL (RFP) OR REQUEST FOR QUOTATION (RFQ) AND DOES NOT COMMIT BROOKHAVEN NATIONAL LABORATORY (BNL) TO AWARD A CONTRACT NOW OR IN THE FUTURE The purpose of this notice is to assist the BNL in determining if there are any sources manufacturing/producing DC Power Supply Cable according to the requirements listed below. BNL does not intend to award a contract on the basis of this notice or otherwise pay for information requested.

No entitlement or payment of direct or indirect costs or charges by BNL will arise as a result of the submission of responses to this notice and BNL’s use of such information. There will be no question-and-answer period associated with this Sources Sought Notice. BNL is seeking responses from all responsible sources, including large and small businesses, capable of providing DC Power Supply Cable. Cable Qty.

Summary: Cable Type Length (ft) 10 AWG 1,500,000 300 MCM 250,000 350 MCM 1,500,000 400 MCM 250,000 444.4 MCM 150,000 535.3 MCM 1,500,000 8 AWG 200,000 Cable Specifications:

DLO 2,000V Cable Jacket Temperature Rating: 75 (°C) Tray rated Plenum rating flame test: NFPA 262 / UL 910 / CSA FT6 Approved Jacket Materials: Chlorosulfonated polyethylene (Hypalon) Cross-linked Polyethylene (XLPE) Cross-linked Polyolefin (XLPO) Ethylene vinyl acetate (EVA) Polychloroprene rubber (Neoprene) Polyethylene (PE) Polyethylene terephthalate copolymers ( Hytrel) Polyimide (Kapton) Polyolefin- Propylene Elastomers (EPR, EPDM) Polyolefin-Thermoplastic Propylene (PP) Polyurethane rubber (PUR) Polyvinylchloride (PVC) Styrene-butodiene rubber (SBR)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 13, 2024

    Sources sought

    Due June 21, 2024 at 5:00 PM EDT. SAM.gov, notice 30cd84d2dfaf41a9acf96b28245debcd

Points of contact