Skip to content
  • 6,813 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Sources sought, local area set-aside

Acquisition of Water Management Plan (Storm Water Pollution Prevention)

SS-25-072R

Department of Energy, Princeton Lab - DOE Contractor. Administration of Air and Water Resource and Solid Waste Management Programs.

Response deadline

November 12, 2025 at 4:00 PM EST

Closed 354 days ago. Posted October 30, 2025. Scheduled to archive November 27, 2025.

Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities

Description

As published on SAM.gov.

The Princeton Plasma Physics Laboratory is seeking qualified sources to draft and certify a SPCC Plan with SWPP and Legionella water management program addendums and provide certification of a permitted LSI through a Subcontractor in full
compliance with US EPA regulations and all federal, state, local, and PPPL environmental rules IAW the attached Statement of Work

Sevices shall include the following tasks:

Task 1: Site Visits and Inspections
To satisfy the USEPA planning requirements, Subcontractor will
conduct one site visit at the facility. The site visit will be conducted to
kick off the project and accomplish the following tasks:
 Consult with PPPL personnel to make sure the information
contained within the current plans coincides with the actual
operations at the facility;
 Gather information on any changes or facility upgrades that have
occurred at the site since the last update of the plans;
 Discuss the existing plans and policies;
 Discuss the new format of the plan and focus on potential
additions and/or removal of information;
 Review and mark-up the existing facility drawings/diagrams; and
 Conduct a site walk.
b. Task 2: Plan Preparation
 Using the information gathered during the site visit, Subcontractor
will update the SPCC Plan with good engineering practices. The
plan will include information for SWPP and Legionella water
management program addendums.
 The cost of this scope assumes that one site visit will be required
and that information from PPPL is provided in a timely fashion.
Should additional technical changes occur at the site during the
preparation of the plan, Subcontractor may need to conduct
additional on-site visits for verification of the change(s) and would
prepare a separate cost estimate to incorporate the site visit(s).
 Subcontractor will professionally certify the combined plan that
satisfies requirements and guidelines per USEPA 40 CFR 112.
 After PPPL’s review and after Subcontractor incorporates
pertinent modifications or changes, Subcontractor will provide two
hard copies of the certified Plan. An electronic version of the final
document will also be provided in PDF format for PPPL’s records.
 Upon notification from PPPL of significant site changes affecting
the Plan, Subcontractor will review and revise the document(s), as
necessary. This may include portions of Tasks 1 and 2.
c. Task 3 Training
 Subcontractor will identify groups to be trained.
 Generate and tailor training materials for each group.
 After PPPL’s review and after Subcontractor incorporates
pertinent modifications or changes Subcontractor will deliver
finalized training materials.
 Subcontractor will review and revise the training materials upon
any changes to the Plan, as necessary.
d. Task 4 LSI Certification
Subcontractor will conduct an inspection, repair, integrity test, and PE
certification of PPPL’s LSI in conformance with the following
requirements:
 Inspection: Identify all rips, torn seams, and any punctures.
PPL-PD-SERV-SOW; REV 0 (3/2017) Page 5
 Repair: Any rips, tears, or punctures must be repaired using a
manufacturer-recommended method that is agreed upon between
the PE and repair technician or similar manufacturerrecommended
method with the same or similar material as the
existing liner.
 Liner integrity test: Subcontractor will need to complete a liner
integrity test upon completion of the repairs. The integrity test will
adhere to ASTM Standard Test Method D 6392 standard, or a
similar manufacturer-recommended method.
 Certification: Subcontractor’s PE will need to certify the patches
were applied correctly and the liner integrity test passed.

This is a local area set-aside for firms physically located within 60 miles of Princeton , NJ

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. October 30, 2025

    Sources sought

    Due November 12, 2025 at 4:00 PM EST. SAM.gov, notice 2e7601a9bad7496aa8ad08d226235270

    1 revisions on SAM
    • October 30, 2025: publish, sources sought

Points of contact