Sources sought
Design and Build Mechanical Assembly
SRNS04032024MECHANICALASSEMBLY
Department of Energy, SRNS - DOE Contractor. Other Building Equipment Contractors.
Response deadline
April 29, 2024 at 5:00 PM EDT
Closed 916 days ago. Posted April 3, 2024, first published April 3, 2024. Scheduled to archive May 14, 2024.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2024
17 like it are open now in other building equipment contractors
- Johnston Ridge Observatory Backup Generator Repairs Gifford Pinchot National Forest
Forest Service, Gifford Pinchot National Forest
Combined synopsis and solicitationSmall businessNAICS 238290WashingtonGifford Pinchot National Forest1240BD27Q0009Closes in 2 daysNov 3 - WSTF Tank Pipe Insulation
Department of the Navy, Naval Undersea Warfare Center
SolicitationSmall businessNAICS 238290Keyport, WAN0025327Q0003Closes in 2 daysNov 3 - WTX Elevator Inspections and Load Testing Services
Department of Veterans Affairs, 257-Network Contract Office 17
Combined synopsis and solicitationSDVOSBNAICS 238290Texas36C25727Q0027Closes in 4 daysNov 5
Description
As published on SAM.gov.
This is a REQUEST FOR INTEREST ONLY! This request does not constitute a request for proposal, request for quote, or invitation for bid. The intent of this request is to identify potential offerors for market research purposes only.
Request for Information (RFI) Savannah River Nuclear Solutions, LLC (SRNS), which manages and operates portions of the Savannah River Site (SRS) under a Department of Energy (DOE) prime contract, seeks information from parties capable of design and build a mechanical assembly. The SRS complex is located approximately 15 miles south of Aiken, South Carolina and is 310 contiguous square miles.
Scope summary Develop a mechanical assembly that is capable of transferring a specified weight of powdered material (density of 1.3-3 gram/cc) from a 55-gallon stainless steel drum to adjacent tank with minimum operator contact. The assembly would have access to power and air supply as required. It would be placed in an outdoor, covered structure with a height restriction of 10 feet.
The transfer of the material would be over approximately 5-6ft distance and would need to minimize any “dust” associated with moving of contents. The initial/final weight of the material would need to be able to be documented. A supplier's response to the RFI does not guarantee they will be selected to participate in the RFP. Suppliers responding to this RFI shall include evidence of the following:
Supplier Capability statement/personnel qualifications Standard lead time for design, fabrication and delivery Past performance relative to subject scope E-mail response addressing Items 1 through 3 above (attachments in pdf format) shall be submitted by 5:00 p.m. est. on 4/29/24 to Barbara McCarty at barbara.mccarty@srs.gov.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- Barbara McCartybarbara.mccarty@srs.gov8036465751