Solicitation, total small business set-aside, first published as presolicitation
Solicitation for Semiconductor Device Assembly (Diode Box) (NSN 5961-01-522-9461CX / PN 816-3385-001)
SPRWA1-26-Q-0022
Defense Logistics Agency, DLA Aviation at Warner Robins, Ga. Other Aircraft Parts and Auxiliary Equipment Manufacturing.
Response deadline
August 27, 2026 at 5:00 PM EDT
Closed 66 days ago. Posted August 12, 2026, first published July 21, 2026. Scheduled to archive August 26, 2027.
Get the next one like this from Defense Logistics Agency by email, the day it is posted.Find my opportunities
This one closed in 2026
538 like it are open now in other aircraft parts and auxiliary equipment manufacturing
- Repair of the Attitude Heading Reference System (AHRS) Applicable to the TH-1H Helicopter
Department of the Air Force, FA8524 AFSC Pzaaa
PresolicitationNAICS 336413Anywhere in the USFD20602700066Closes todayNov 1 - MH65 Hose
US Coast Guard, Aviation Logistics Center (Alc)
Combined synopsis and solicitationNAICS 336413Anywhere in the US70Z03827QB0000005Closes tomorrowNov 2 - MH-65 HOSE ASSEMBLY, METALLIC
US Coast Guard, Aviation Logistics Center (Alc)
Combined synopsis and solicitationNAICS 336413Anywhere in the US70Z03827QB0000008Closes tomorrowNov 2
All 538 open in other aircraft parts and auxiliary equipment manufacturing
Description
As published on SAM.gov.
This action is to award a one-time buy contract for the Semiconductor Device Assembly (Diode Box) (NSN 5961-01-522-9461CX / PN 816-3385-001). Required delivery will consist of a First Article (FA) requirement of 2 ea. and then full rate production quantity of 68 ea. upon approval of FA testing. Ship To: SW3119 / F.O.B. Origin. Award is anticipated on or before 30 September 2026 with period of performance running through September 2027.
The Semiconductor Device Assembly provides for isolation between various electrical components on
the KC-135 and similar platforms.
The Government will provide technical data to responsible, interested parties upon request. The awardee will be required to manufacture assets in accordance with the FA test requirements and specifications as approved by the Government.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- SPRWA1-26-Q-0022(1).pdf890 KB, August 12, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 21, 2026
Presolicitation
Synopsis for Semiconductor Device Assembly (Diode Box) (NSN 5961-01-522-9461CX / PN 816-3385-001)
Due August 5, 2026 at 5:00 PM EDT. SAM.gov, notice 1a849a23c92b42dfb3361bf19c2d5411
2 revisions on SAM
- August 12, 2026: publish, solicitation
- July 21, 2026: publish, presolicitation
August 12, 2026
Solicitation, originally presolicitation
Due August 27, 2026 at 5:00 PM EDT. SAM.gov, notice 68558f41275b48edab6cf6e376c729b6
2 revisions on SAM
- August 12, 2026: publish, solicitation
- July 21, 2026: publish, presolicitation
Points of contact
- Robert Bergrobert.berg.9@us.af.mil