Solicitation
Connector, plug, Electrical
SPMYM226Q5646
Defense Logistics Agency, DLA Maritime - Puget Sound. Electronic Connector Manufacturing.
Response deadline
May 21, 2026 at 2:00 PM EDT
Closed 171 days ago. Posted May 19, 2026. Scheduled to archive June 5, 2026.
Get the next one like this from Defense Logistics Agency by email, the day it is posted.Find my opportunities
This one closed in 2026
79 like it are open now in electronic connector manufacturing
- PARTS KIT
Defense Logistics Agency, DLA Maritime - Pearl Harbor
SolicitationNAICS 334417Anywhere in the USSPMYM427Q3039ACloses todayNov 8 - CONNECTOR,PLUG,ELECTRI
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationNAICS 334417Anywhere in the USSPE7M527U0036Closes in 2 daysNov 9 - DUMMY CONNECTOR,PLU
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationNAICS 334417Anywhere in the USSPE7M527T1622Closes in 2 daysNov 9
Description
As published on SAM.gov.
THIS SOLICITATION AND ANY SUBSEQUENT AMENDMENTS WILL BE POSTED TO THE SAM WEBSITE: SAM.GOV
ELECTRONIC SUBMISSION OF QUOTES IS AVAILABLE THROUGH THE SAM WEBSITE.
To be considered for award, if the contractor (awardee) is required to implement NIST SP 800-171, the contractor (awardee) shall have a current assessment as detailed in DFARS 252.204-7019 (I.E., not more than 3 years old unless a lesser time is specified in the solicitation)
**Items deemed to be Commercial Off The Shelf (COTS) are exempt from NIST SP 800-171 requirement. Must identify and provide information to contracting officer on bid during solicitation period**
Please read the contract in its entirety.
If you are able to provide a quote be sure to provide the following information in the sections provided below:
-
Page 1 BLK 17a. Provide Contractor's info and cage code.
-
Section A. A1 – 1. Enter The Contractor's POC
-
Section B. – Enter your Quote and any other info we should know.
-
Please quote FOB Destination BREMERTON, WA.
-
Section B. K21 – Check the appropriate box and provide the Manufacturer’s Name, Address and the Country of Manufacturing
-
Section F. – Provide the Lead Time and/or Delivery Date.
-
Section K. - 52.204-24 (d)(1) and (2) Check the applicable boxes
-
Page 1 - Read box 28 and sign boxes 30 a, b, and c.
-
Return the signed and filled out solicitation with your quote by THURSDAY, 21 MAY 2026, 11am PST
FOR YOUR BID TO BE DEEMED RESPONSIVE A SIGNED AND COMPLETED SOLICITATION MUST BE SUBMITTED VIA EMAIL.
**** BOTH THE SOLICITATION PACKAGE AND THE AMENDMENT (SF-30) MUST BE SIGNED AND DATED FOR YOUR BID TO BE CONSIDERED****
EMAIL: david.dominguezjr@dla.mil
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- SPMYM226Q5646- Connector Plug- Solicitation.pdf1.9 MB, May 19, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 19, 2026
Solicitation
Due May 21, 2026 at 2:00 PM EDT. SAM.gov, notice 2e1d61e697064268935cf8649e74e71b
1 revisions on SAM
- May 19, 2026: publish, solicitation
Points of contact
- DAVID DOMINGUEZDAVID.DOMINGUEZJR@DLA.MIL4457370812