Skip to content
Abierto

Justification, first published as sources sought

SPE4A725R0188 –2925 - LEAD ASSEMBLY, SPARK IGNITER AND IGNITER SPARK, GAS TURBINE ENGINE

SPE4A725R0188

Defense Logistics Agency, DLA Aviation. Aircraft Engine and Engine Parts Manufacturing.

Response deadline

January 31, 2025 at 6:00 PM EST

Closed 594 days ago. Posted June 8, 2026, first published November 21, 2024. Scheduled to archive July 8, 2026.

Description

As published on SAM.gov with the presolicitation of December 17, 2024.

NSN: 2925-006204430;

LEAD ASSEMBLY, SPARK IGNITER and NSN: 2025-009640823; IGNITER, SPARK, GAS TURBINE;

WSIC: N;

IQC PR: 1000194962. THE APPROVED MANUFACTURING SOURCE IS CHAMPION AEROSPACE LLC (Cage 0AFL4). THIS SOLICITATION WILL RESULT IN AN INDEFINITE QUANTITY CONTRACT (IQC) FOR A BASE PERIOD OF 5 YEARS WITH ZERO (0) OPTIONS. IT WILL BE ISSUED AS UNRESTRICTED (OTHER THAN FULL AND OPEN COMPETITION NOT PREVIOUSLY ADDRESSED). THIS IS A DLA DIRECT PROCUREMENT. CERTIFIED COST AND PRICING DATA IS REQUIRED FOR PROCUREMENTS EXCEED $2 MILLION. EE0 CLEARANCE IS NOT REQUIRED.

PRICE, PAST PERFORMANCE, AND DELIVERY WILL BE EQUALLY WEIGHTED. THIS REQUEST IS FOR A WIRTTEN QUOTE. PLEASE SUBMIT OFFERES IN WRITING. THE FINAL CONTRACT AWARD DECISION MAY BE BASED UPON A COMBINATION OF PRICE, PAST PERFORMANCE, SPRS AND OTHER EVALUATION FACTORS AS DESCRIBED IN THE SOLICITATION. THIS REQUEST IS FOR A WIRTTEN QUOTE. PLEASE SUBMIT OFFERES IN WRITING.

NSN 2925-00-620-4430: THE ESTIMATED ANNUAL QUANITTY IS 104 EACH; THE MINIMUM DELIVERY ORDER QUANTITY IS 26; THE MAXIMUM DELIVERY ORDER QUANTITY IS 104. THE DELIVERY DATE WILL BE 132 DAYS AFTER DATE OF ORDER. THIS IS A CRITICAL SAFETY ITEM. INSPECTION AND ACCPETANCE WILL BE AT ORIGIN, FOB IS AT DESTINATION NSN 2025-00-964-0823: THE ESTIMATED ANNUAL QUANITTY IS 319 EACH; THE MINIMUM DELIVERY ORDER QUANTITY IS 80 THE MAXIMUM DELIVERY ORDER QUANTITY IS 319. THE DELIVERY DATE WILL BE 104 DAYS AFTER DATE OF ORDER.

THIS IS NOT A CRITICAL SAFETY ITEM. THIS IS A COTS. INSPECTION AND ACCPETANCE WILL BE AT ORIGIN, FOB IS AT DESTINATION A COPY OF THE SOLICITATION WILL BE AVAILABLE VIA THE DLA INTERNET BID BOARD SYSTEM (DIBBS) AT HTTPS://WWW.DIBBS.BSM.DLA.MIL/RFP ON THE ISSUE DATE CITED IN THE SOLICITATION. FROM THE DIBBS HOMEPAGE, SELECT "REQUESTS FOR PROPOSAL (RFP) / INVITATION FOR BID (IFB)" FROM THE MENU UNDER THE TAB "SOLICITATIONS." THEN SEARCH FOR AND CHOOSE THE RFP YOU WISH TO DOWNLOAD.

SOLICITATIONS ARE IN PORTABLE DOCUMENT FORMAT (PDF). TO DOWNLOAD AND VIEW THESE DOCUMENTS YOU WILL NEED THE LATEST VERSION OF ADOBE ACROBAT READER. THIS SOFTWARE IS AVAILABLE FREE AT HTTP://WWW.ADOBE.COM. A PAPER COPY OF THE SOLICITATION WILL NOT BE AVAILABLE TO REQUESTORS. THE SOLICITATION WILL BE ISSUED ON OR AROUND December 31, 2024.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. November 21, 2024

    Sources sought

    Due November 26, 2024 at 6:00 PM EST. SAM.gov, notice 0f0f6f3275e147d18e8fbe7d71d4bb6d

  2. December 17, 2024

    Presolicitation

    SPE4A725R0188 –2925 – LEAD ASSEMBLY, SPARK IGNITER AND IGNITER SPARK, GAS TURBINE ENGINE

    Due January 31, 2025 at 6:00 PM EST. SAM.gov, notice 5fc26916a7284e578b22dc13e07732b9

  3. June 8, 2026

    Justification, originally presolicitation

    SAM.gov, notice 9961f13798994e93b48beaac2f61f8f7

Points of contact