ROOSTER-6 Integration & Support RFI
ROOSTER_RFI_FY26_0001
Department of the Air Force, FA8819 Sda and Combat Power SZK-LA. Guided Missile and Space Vehicle Manufacturing.
Response deadline
February 27, 2026 at 7:30 PM EST
Closed 246 days ago. Posted February 11, 2026, first published February 10, 2026. Scheduled to archive March 14, 2026.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2026
7 like it are open now in guided missile and space vehicle manufacturing
- High-Performance Space Computing (HPSC) (Pre-RFI Market Research)
National Aeronautics and Space Administration, NASA Management Office -- JPL
Sources soughtNAICS 336414Pasadena, CASBPO-2610-09012026Closes in 12 daysNov 13 - Spacecraft Electrical Power Systems (Pre-RFI Market Research)
National Aeronautics and Space Administration, NASA Management Office -- JPL
Sources soughtNAICS 336414Pasadena, CASBPO-2610-03092026Closes in 12 daysNov 13 - Chemical and Electric Propulsion Systems (Pre-RFI Market Research)
National Aeronautics and Space Administration, NASA Management Office -- JPL
Sources soughtNAICS 336414Pasadena, CASBPO-2610-01092026Closes in 12 daysNov 13
All 7 open in guided missile and space vehicle manufacturing
Description
As published on SAM.gov.
Please see the attached document titled Rooster 6 Integration Support in Attachments for full description and Instructions to responders:
SCOPE AND DEFINITIONS:
Space Systems Command (SSC), SYD-89 Capability Development System Program Manager (SPM)
(SSC/SYD89/SYA) is soliciting information about potential sources for the ROOSTER-6 Integration &
Support Contract, to perform the integration of a secondary payload ring/platform capable of hosting
multiple payloads to support national security missions. The integration of payloads will be for mission
sets spanning across SSC and potentially other USSF or DoW partners. Missions can vary from
experimental/prototyping to operational. These platforms will launch on National Security Space Launch
(NSSL) missions and can include payloads up to the highest classified levels. The Government seeks
information on existing integration expertise with the ESPAStar-D platform and integrating multiple
mission payloads and associated acquisition/contract structure, technical, cost, and schedule feasibility.
Two types of payloads are expected to be manifested on the platforms furnished to the ROOSTER-6
Integration & Support Contract: 1) on-orbit separable payloads, and 2) on-orbit non-separable payloads.
The two types of payloads intended for integration as well as any encryption devices (if needed) will be
provided as Government Furnished Equipment (GFE). Separable payloads are integrated on to the multimission
host ring/platform and are deployed days to months after launch. The specific port that the
payload will be “fully integrated” into will be on a Northrup Grumman built ESPAStar-D class secondary
payload ring. Non-separable payloads are integrated on the host ring/platform and remain with it for the
entire mission duration. The term “fully integrated” is used to describe a platform with payloads
mounted and integrated into available secondary payload ring ports and fully tested at the system (ring)
level.
CAPABILITY REQUIREMENT:
SYD 89/SYA seeks an experienced integrator for this flexible and modular propulsive host satellite
ring/platform that will accommodate multiple payloads (separable and hosted) in support of different
mission sets primarily in a GEO Orbit. The capability to operate in other orbital regimes is also under
consideration. The host ring/platform will have a minimum operational design life of 2 years. These
missions will be launched on NSSL missions as part of an Integrated Payload Stack (IPS) that is expected
to include other spacecraft or payload adapters. As part of the launch manifest, integrated vehicles must
meet all launch safety requirements including coupled loads analysis, thermal analysis, and testing to
actual or forecasted launch environments. The propulsive host ring/platform shall at a minimum be
capable of hosting six ESPAStar-D Class Payloads. Functional testing of the integrated propulsive host
vehicle in a simulated space environment is also expected. Support for workarounds, such as testing with
payload mass simulators, is expected to accommodate payloads that will not arrive until processing at the
launch site. The propulsive host ring/platform structure is intended for attachment and separation from the
launch vehicle Payload Attachment Fitting (PAF) or another payload adapter of the same size. Once
separated from the launch vehicle, the multi-mission host ring/platform must support separable payloads
until they are deployed into their intended orbits and continue to support non-separable payloads for
mission duration.
GENERAL DESCRIPTION OF WORK REQUIRED:
Payloads may have greatly differing mission sets, which will create a wide range of different
requirements for each. Generally, however, the integration to the propulsive host ring/platform to the
payloads should include structural, maneuver, power, software, and data/communication links required to
monitor and sustain the non-separated spacecraft and perform hosted payloads’ on-orbit mission. To
integrate payloads into the host ring/platform the Government expects the following general work
requirements:
• Contractor will fully integrate separable and non-separable payloads into the host platform
•Contractor will support standard space vehicle environmental testing of the integrated host ring/platform
•Contractor will support launch and early on-orbit operations, including anomaly resolution
•Ability to support payloads at various classification levels up to and including TS/SCI and SAP, to include personnel, facilities, security, communication systems, processes, etc
•Ability to support late manifested payloads (less than L-12 months)
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Rooster 6 Integration Support_RFI 10FEB26.pdf329 KB, February 11, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
February 11, 2026
Sources sought
Due February 27, 2026 at 7:30 PM EST. SAM.gov, notice 2ac54d1eb62948a58f7d58beb0be149f
3 revisions on SAM
- February 11, 2026: publish, sources sought
- February 11, 2026: publish, sources sought
- February 11, 2026: publish, sources sought
February 11, 2026
Sources sought
Due February 27, 2026 at 7:30 PM EST. SAM.gov, notice 817c680da43548108e68954827f8d2a8
3 revisions on SAM
- February 11, 2026: publish, sources sought
- February 11, 2026: publish, sources sought
- February 11, 2026: publish, sources sought
February 11, 2026
Sources sought
Due February 27, 2026 at 7:30 PM EST. SAM.gov, notice b0edb8e5f6f640bebe203d7120b78d5a
3 revisions on SAM
- February 11, 2026: publish, sources sought
- February 11, 2026: publish, sources sought
- February 11, 2026: publish, sources sought
Points of contact
- Capt Abigail Arestidesabigail.arestides.2@spaceforce.mil
- Peter Vaccaro, CTRpeter.vaccaro.ctr@spaceforce.mil