Carbon Pollution-Free Electricity Projects at Savannah River Site (Phase 2)

RFQ8900FY24004

Department of Energy, Savannah River Operations Office. Other Electric Power Generation.

Response deadline

November 1, 2024 at 5:00 PM EDT

Closed 685 days ago. Posted October 10, 2024, first published August 21, 2024. Scheduled to archive November 16, 2024.

Description

As published on SAM.gov.

This is an official notice to interested parties and prospective offerors that the Department of Energy (DOE) is releasing the Request for Qualifications (RFQ) pertaining to a Realty Agreement for Carbon Pollution-Free Electricity (CFE) Project(s) at the Savannah River Site. Offerors shall submit a narrative, with supporting figures and schematics, as needed, describing the overall project and the proposed CFE technology.

For CFE technologies that are not in widespread usage, the Offeror shall include a detailed description of the technology including a discussion on the level of technology readiness. The narrative shall indicate the approximate location within the available Property that is preferred and shall include a conceptual layout of the facility, required acreage, expected annual MWh generation, discussion of specific site considerations relative to design, construction and operation of the CFE facility.

The project description shall also include discussion with supporting figures and schematics, as needed, of the transmission facilities, system components and ancillary equipment. Should the offeror desire to include within the scope of their response the construction of facilities other than power generation, e.g., clean hydrogen plant, data center, etc., the offeror must include details at a level like the level of detail required for the CFE generation facility.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 21, 2024

    Special notice

    Due October 4, 2024 at 5:00 PM EDT. SAM.gov, notice cd92e9286dda4e689b2c3b4376902a9a

  2. September 23, 2024

    Special notice

    Due October 18, 2024 at 5:00 PM EDT. SAM.gov, notice 1b9d6e9418974478b557eb55645300b1

  3. October 10, 2024

    Special notice

    Due November 1, 2024 at 5:00 PM EDT. SAM.gov, notice 2d1a6791150b42938b91a838d310f376

  4. October 10, 2024

    Special notice

    Due November 1, 2024 at 5:00 PM EDT. SAM.gov, notice f39e90280f644b0c811230d136e6ce51