Skip to content
Abierto

Solicitation

Regatron TC.ACS Amplifiers

RFQ_2024-008598

Department of Energy, Alliance for Energy Innovation, LLC - DOE Contractor. All Other Miscellaneous Electrical Equipment and Component Manufacturing.

Response deadline

February 8, 2024 at 6:00 PM EST

Closed 952 days ago. Posted January 9, 2024. Scheduled to archive February 9, 2024.

Description

As published on SAM.gov.

NREL’s Distributed Integrated Energy Lab (DIEL) project at the Flatirons Campus, is creating a grid emulator system that will allow for both Controller Hardware-in-the-Loop (C-HIL) and Power Hardware-in-the-Loop (P-HIL) testing and validation at NREL’s Flatirons Campus. DIEL is a research facility interconnecting various multi-kW to MW-scale generation sources (wind, solar, waterpower), loads, and other assets.

OBJECTIVE: The grid emulator system will consist of two subsystems that need the following:

A 400 kVA rated AC power amplifier system which will be installed in a building at the Flatirons Facility and connected to existing generation assets and the controlled grid interface. A mobile AC power amplifier system rated to 60 kVA which should be relatively easy to move between different test buildings.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. January 9, 2024

    Solicitation

    Due February 8, 2024 at 6:00 PM EST. SAM.gov, notice 4e5d4ed5e2e141b19491f601b59a48fb

Points of contact