Solicitation
PIP-II HPRF WR1150 Waveguide Directional Couplers for LB/HB650
RFP_375414RLP
Department of Energy, Fermilab - DOE Contractor. All Other Miscellaneous Electrical Equipment and Component Manufacturing.
Response deadline
November 7, 2025 at 6:00 PM EST
Closed 359 days ago. Posted October 31, 2025, first published October 23, 2025. Scheduled to archive November 8, 2025.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2025
57 like it are open now in all other miscellaneous electrical equipment and component manufacturing
- NG SEW-ELECTRICAL COMPONENTS
Department of the Army, W6QK ACC-RI
SolicitationSmall businessNAICS 335999Anywhere in the USW519TC26QA164Closes in 263 daysJul 22, 2027 - INTERCONNECTING BOX
Defense Logistics Agency, DLA Aviation
Combined synopsis and solicitationSmall businessNAICS 335999Anywhere in the USSPE4A727T1998Closes in 2 daysNov 2 - POWER SUPPLY
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationHUBZoneNAICS 335999Anywhere in the USSPE7L727T0354Closes in 2 daysNov 2
All 57 open in all other miscellaneous electrical equipment and component manufacturing
Description
As published on SAM.gov.
Please provide proposal that meets specifications in document RFP 375414RLP and provide completed documents: SARC and PUR466.
10/31/2025 UPDATE:
Based on questions received, Fermilab would like to provide additional information regarding this RFP:
Fermilab needs couplers to sustain small differential air pressure. This will ensure that there are acceptable levels of non-ionizing radiation around the RF distribution lines after constructed or modified.
Fermilab expects the RF distribution to run fully reflected from the cavity. Cross talk between ports during operation must be limited for diagnostic purposes.
Having one 18” long coupling port on each wall would be acceptable.
Fermilab has found that the termination is the most delicate part of the directional coupler. Previous replacements have occurred in the past. Having an external termination makes repair process easier. An acceptable option would be an internal termination that could be replaced in house, in the event of failure.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- FFDG General Terms and Conditions for Commercial Products and Commercial Services (08.2025).pdf387 KB, October 24, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
October 24, 2025
Solicitation
Due November 7, 2025 at 6:00 PM EST. SAM.gov, notice 4556332c5737449aaa5617e2053cd46a
2 revisions on SAM
- October 31, 2025: publish, solicitation
- October 24, 2025: publish, solicitation
October 31, 2025
Solicitation
Due November 7, 2025 at 6:00 PM EST. SAM.gov, notice 11bd46b38fc64d72a84da7f546687a1e
2 revisions on SAM
- October 31, 2025: publish, solicitation
- October 24, 2025: publish, solicitation
Points of contact
- Rhiannon Pattersonrhiannon@fnal.gov6054312905