Sources sought
Automated Tape Wrapping System
RFI-25-026
Department of Energy, ORNL Ut-Battelle LLC-DOE Contractor. All Other Miscellaneous Electrical Equipment and Component Manufacturing.
Response deadline
July 9, 2025 at 5:00 PM EDT
Closed 481 days ago. Posted June 20, 2025. Scheduled to archive July 15, 2025.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2025
57 like it are open now in all other miscellaneous electrical equipment and component manufacturing
- POWER SUPPLY
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationHUBZoneNAICS 335999Anywhere in the USSPE7L727T0354Closes tomorrowNov 2 - INTERCONNECTING BOX
Defense Logistics Agency, DLA Aviation
Combined synopsis and solicitationSmall businessNAICS 335999Anywhere in the USSPE4A727T1998Closes tomorrowNov 2 - WIRING HARNESS,BRAN
Defense Logistics Agency, DLA Aviation
Combined synopsis and solicitationSmall businessNAICS 335999Anywhere in the USSPE4A627T6534Closes tomorrowNov 2
All 57 open in all other miscellaneous electrical equipment and component manufacturing
Description
As published on SAM.gov.
Automated Tape Wrapping System UT-Battelle (UTB), operating contractor for Oak Ridge National Laboratory (ORNL), seeks supplier sources to enable equipping and commissioning an Automated Tape Wrapping system to support composite perform production needs. ORNL aims to enhance its prototype capabilities through the implementation of this equipment, which will facilitate the efficient and precise laying of woven prepregged carbon fiber tape in our composite fabrication processes.
The system must be capable of laying woven, prepegged carbon fiber tape up to 12 inches wide. It is essential that the system accommodates varying tape thicknesses while maintaining consistent tension and pressure throughout the layup process. The system must be able to deposit tape around complex geometries, particularly flat arches with an inner radius of 9 inches.
The equipment should provide the necessary precision and flexibility to navigate these shapes without compromising the quality of the fiber architecture. The Automated Tape Wrapping system should enable programmable controls, including but not limited to, precise tape placement, adjustable layup angle, temperature control, roller pressure, tension, and feeding speed. Integration with computer-aided design (CAD) software for generating and modifying complex layup patterns is also desired.
In addition, comprehensive on-site installation support is required as part of the procurement process. The selected vendor shall collaborate closely with personnel at UTB to ensure proper system integration and full compliance with operational standards. Detailed information on the system's maintenance protocols, including component accessibility and the availability of spare parts is requested.
Additionally, comprehensive training must be provided to UTB personnel to ensure effective operation and maintenance of the equipment, enabling the in-house team to manage the system independently and efficiently.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 20, 2025
Sources sought
Due July 9, 2025 at 5:00 PM EDT. SAM.gov, notice 66d8bdbaedee46e6b53d15afddfcceb3
Points of contact
- Tess KlattKlattTA@ornl.gov