Skip to content
Abierto

Combined synopsis and solicitation, service-disabled veteran-owned small business set-aside

940 | Fargo National Cemetery | Grounds Maintenance and Interment Operations | Bridge -- S208

QSE--36C78625Q50125

Department of Veterans Affairs, National Cemetery Admin. Landscaping Services.

Response deadline

February 21, 2025 at 1:00 PM EST

Closed 574 days ago. Posted February 12, 2025, first published January 31, 2025. Scheduled to archive March 28, 2025.

Description

As published on SAM.gov.

940 | Fargo National Cemetery | Grounds Maintenance and Interment Operations | Bridge -- S208 This request is for a short term IDIQ bridge contract for burial and GMC at Fargo (940) until a base plus 4 year contract is awarded. Planned POP is from 03/03/25 - 08/31/2025.

The Contractor shall provide all personnel, equipment, tools, supervision, and other items and services necessary to ensure that interment operations are performed at the Cemetery in a manner that shall maintain proper decorum and respect; and grounds maintenance operations are performed at the Cemetery in a manner that shall maintain healthy grass, trees, shrubs, and plants; and present a groomed, clean, neat, and professional appearance.

Services include, but are not limited to maintenance of grounds, regular mowing, weed eating, blade edging, trimming, removal of leaves and debris, as well as, sweeping or blowing off roads and sidewalks, irrigation system maintenance and operation, maintenance of gravesites and headstones, the raising and realignment of headstones, washing headstones, initial and replacement headstone installation and maintenance, turf maintenance, mulched planting bed maintenance, plant and tree maintenance, sunken grave repair, transporting casketed and cremated remains from the committal service area to the gravesite, interments of casketed and cremated remains, disinterment’s, grave excavation and backfilling, trash removal, snow and ice removal, placement and removal of flags.

The Contractor may be required to be on-site Memorial Day weekend and other special days as requested by the CO. No materials, tools (to include casket cart and lowering device), vehicles, sod, staging area or rest room facilities to include temporary port-o-lets will be provided by the National Cemetery Administration and Fort Snelling. It is the contractor’s responsibility to supply all within NCA Standards.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. January 31, 2025

    Combined synopsis and solicitation

    Due February 21, 2025 at 1:00 PM EST. SAM.gov, notice 63820a4c119b49d5ad68a052067c3d3f

  2. January 31, 2025

    Combined synopsis and solicitation

    Due February 21, 2025. SAM.gov, notice 8864abf895974c76a8107c1532b0eb32

  3. February 6, 2025

    Combined synopsis and solicitation

    Due February 21, 2025 at 1:00 PM EST. SAM.gov, notice c2efcd3d58c34bc6b14029b62599b3ba

  4. February 12, 2025

    Combined synopsis and solicitation

    Due February 21, 2025 at 1:00 PM EST. SAM.gov, notice c7512e6dd2064ab1ba6261df7ba6a76f

Points of contact