Solicitation
Plasma Arc Melting System
PR396924
Department of Energy, ORNL Ut-Battelle LLC-DOE Contractor. Welding and Soldering Equipment Manufacturing.
Response deadline
August 13, 2025 at 3:00 PM EDT
Closed 449 days ago. Posted August 1, 2025, first published July 22, 2025. Scheduled to archive August 13, 2025.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2025
10 like it are open now in welding and soldering equipment manufacturing
- TRANSFORMER,POWER
Defense Logistics Agency, DLA Aviation
Combined synopsis and solicitationSmall businessNAICS 333992Anywhere in the USSPE4A627T7432Closes tomorrowNov 5 - ERCuNiAl TIG Wire
Department of the Navy, NSWC Philadelphia Div
Combined synopsis and solicitationSmall businessNAICS 333992Anywhere in the USN6449827Q0003Closes tomorrowNov 6 - SOLDERING-DESOLDERI
Department of the Navy, NAVSUP Weapon Systems Support Mech
SolicitationNAICS 333992Anywhere in the USN0010427QBA22Closes in 4 daysNov 9
All 10 open in welding and soldering equipment manufacturing
Description
As published on SAM.gov.
Plasma Arc Melting System Oak Ridge National Laboratory (ORNL) is requesting proposals for a pilot-scale plasma arc melting system to support research on refractory metal alloys. The system must be adaptable for various feedstock types and melting conditions, with precise control over heat input, melt rate, and gas environment. Key specifications include:
Melter Characteristics:
Plasma Torch System: Programmable motion control with multiple plasma torches and controlled gas delivery.
Cooling System: Closed-loop water cooling for heat-sensitive components, with integrated manifold and valves.
Material Feeding: Capability to handle compacted powder, turnings, and scrap, with optional bar feeders.
Ingot Forming: Vertical ingot formation in induction-heated molds, producing solid ingots (max: 100 mm x 100 mm x 1000 mm; min: 50 mm diameter x 1000 mm).
Melting Rate: Minimum of 1000 cc/hour for refractory metals.
Operational Safety & Integration: Must include necessary framing, enclosures, and controls for safe lab operation, complying with safety codes. Proposals should cover installation, commissioning, training, and a list of recommended spare parts and consumables.
Utility Requirements:
Power: 480 V, 3-phase, 60 Hz, ?1200 KVA total demand.
Gases: Helium and argon at 120 psi.
Cooling Water: 350 gallons per minute from a tower loop and 80 gallons for emergency use.
Facility Constraints: Max footprint: 35 ft (L) x 28 ft (W) x 25 ft (H), supported by an 11-inch thick concrete slab, with no below-grade installation required.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 22, 2025
Solicitation
Due August 6, 2025 at 3:00 PM EDT. SAM.gov, notice 084c731961ce414c8ac09541156b2963
July 28, 2025
Solicitation
Due August 13, 2025 at 3:00 PM EDT. SAM.gov, notice 47fc659a0f4e4d909d5d5a5a4d522cab
August 1, 2025
Solicitation
Due August 13, 2025 at 3:00 PM EDT. SAM.gov, notice e13f3a51cf2a4d8ca81dd639afa2e6f8
August 1, 2025
Solicitation
Due August 13, 2025 at 3:00 PM EDT. SAM.gov, notice e514135bcf6e4f54a21864a7dcb3c2a8
Points of contact
- Mckenzi Bazbazmk@ornl.gov8655766063