Skip to content
  • 6,986 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans
AbiertoGet started

Presolicitation

Pre-Solicitation Notice - Trenching, Conduit and Ground-well Installation

PR16330526

Department of State, U.S. Embassy Kingston. Site Preparation Contractors.

Offers due

October 26, 2026 at 3:00 PM EDT

14 days from now. Posted October 9, 2026.

Get an email when this is amended, when the deadline moves and when it is awarded.Watch it

Next from this buyer

Similar, open now

All 4 open in site preparation contractors

Description

As published on SAM.gov.

Description

The United Stated Embassy in Kingston, Jamaica, plans to issue a Request for Quotations (RFQ) for trenching, conduit and ground-well installation in various locations on the Embassy compound.

Scope of Work: The contractor will provide all labor, equipment, supervision, material specific to the back filling and compaction and management needed to complete the job

Infrastructure Support System - Handhole / Underground Conduit System

Trenching

  • Nine locations have been identified requiring trench work.
  • Thirteen locations have been identified requiring trench work.
  • Before excavation, the Contractor shall locate and verify all existing utilities in the proposed trench alignment.
  • If excavation interferes with existing drains, piping, or structures, the Contractor shall immediately notify, in writing, the COR and provide temporary protection for these systems before proceeding.

Trenching from Handholes

  • The Contractor shall make wall penetrations into existing manholes/handholes as required for the number and size of conduits entering and exiting each structure, in accordance with the drawings.

Conduit

  • Existing conduit shall remain in place unless the drawings specifically direct removal or modification.
  • Under grass, soil, the Contractor shall install Schedule 80 PVC conduit with a minimum cover of 24 inches (610 mm) from finished grade to top of conduit, or as indicated on the drawings, whichever is greater.
  • All underground 90 degree bends with a 12inch (305 mm) radius shall use prefabricated sweeping bends.
  • Above grade, all underground PVC conduit shall transition to rigid galvanized steel (RGS) using PVC to RGS couplers.
  • The Contractor shall install pull lines in all new conduit runs.

Soil and Backfill Materials

Soil Materials

The Contractor shall provide all labor and materials for soil and backfill, where required.

  • Select Backfill: ASTM D 2487 soil classification groups SW, SP, and SM, or combinations thereof; free of rock or gravel larger than 3 inches (75 mm), debris, waste, frozen materials, vegetation, and other deleterious matter.
  • Asphalt/Concrete Base Course: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 95% passing a 11/2inch (40 mm) sieve and not more than 8% passing a 1/4inch (6.4 mm) sieve.
  • Base Gravel: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; 100% passing a 1inch (25 mm) sieve and not more than 8% passing a 1/4inch (6.4 mm) sieve.
  • Sand Cushion: ASTM C 33 fine aggregate, natural or manufactured sand.

Placement and Compaction

  • Place backfill and fill in layers not exceeding:
    • 8 inches (203 mm) loose thickness for heavy compaction equipment;
    • 4 inches (102 mm) loose thickness when compacted by hand-operated tampers.
  • Place backfill and fill evenly to the required elevations, uniformly along their full length.
  • Compact soil materials to not less than the following percentages of maximum dry unit weight per ASTM D 1557:
    • Under lawns or unpaved areas: scarify and re-compact top 6 inches (152 mm) below subgrade and compact each layer to 85%.
    • Utility trenches: compact each layer of initial and final backfill to 85%.

Anticipated Period of Performance: a base period of twenty-one (21) days after contract award

Eligibility and Registration

Offerors must hold an active registration in the System for Award Management (SAM.gov) when they submit a proposal and at award.

Local Insurance and Defense Based Act (DBA) Insurance.

Solicitation Availability

The Embassy will post the solicitation and all amendments only on SAM.gov at https://sam.gov. Interested parties should monitor SAM.gov for the release and any amendments. The Embassy will not issue paper copies.

Disclaimer

This notice is for informational purposes only and is not a request for proposals. It does not commit the Government to issue a solicitation or award a contract. The Government will not pay for any information or materials submitted in response to this notice.

Interested Parties are required to send their interest to Kingstonquotes@state.gov on or before October 26, 2026 at 2pm local time.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. October 9, 2026

    Presolicitation

    Due October 26, 2026 at 3:00 PM EDT. SAM.gov, notice b556277dcd5444b78f1c77c33060368d

    1 revisions on SAM
    • October 9, 2026: publish, presolicitation

Points of contact