Skip to content
  • 6,814 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Special notice

Chancery 3003 Integrated window blinds (104)

PR16077115

Department of State, U.S. Embassy Bern. Other Building Finishing Contractors.

Response deadline

August 5, 2026 at 10:00 AM EDT

Closed 88 days ago. Posted July 14, 2026. Scheduled to archive August 30, 2026.

Get the next one like this from Department of State by email, the day it is posted.Find my opportunities

This one closed in 2026

2 like it are open now in other building finishing contractors

Description

As published on SAM.gov.

Statement of Work (SOW): Maintenance & Motor Retrofit (Final Version)

Project: Refurbishment of 104 Integrated Venetian Blinds
Location: Office Building – Bern, Switzerland
System Type: Warema Type 1.16/25/35.07 (24v motor) inside WICONA WICLINE Aluminum Composite Windows

1. Project Objective

The contractor shall provide a turnkey solution for the inspection, repair, and motor retrofit of 104 integrated venetian blinds. The objective is to restore 100% motorized functionality while maintaining the thermal, acoustic, and aesthetic integrity of the WICONA window units.

2. Comprehensive Pricing & Scope

The offer submitted by the contractor must be all-inclusive. No additional costs will be entertained after the contract award. The bid price shall include:

  • Labor: All technician, electrician, and logistical personnel hours.
  • Materials: All motors, cables, lift tapes, ladder cords, and hardware components.
  • Equipment: All tools, specialized window opening devices, safety gear, and cleaning supplies.
  • Transportation: All travel costs, vehicle expenses, and shipping/freight for parts.
  • Fees: Disposal fees, administrative costs, and any required permits or insurance.

3. Logistics & Site Management

  • Furniture Management: Contractor shall move office furniture and equipment as required to gain unobstructed access to the windows. All items must be protected and returned to their original positions upon completion.
  • Surface Protection: Provide appropriate floor and wall protection during the transit of tools and components.

4. Health, Safety & Electrical Standards

  • Qualified Personnel: Only certified electricians (per Swiss regulations) may perform electrical work.
  • Lockout/Tagout (LOTO): A strict LOTO procedure must be implemented. Hazardous energy sources must be isolated, locked, and tagged before work commences.
  • Verification: Zero-energy state must be verified via testing before physical contact with wiring.
  • Controls: Each motor control shall be integrated into the Building KNX system.

5. Technical Execution: WICONA & Warema Systems

  • Sash Access: Open the internal "sandwich" sash of the WICONA windows using the integrated latches.
  • Hardware Maintenance: Inspect and lubricate all WICONA latching mechanisms and concealed hardware.
  • Gasket Inspection: Verify the condition of internal gaskets. Damaged seals must be reported or replaced to ensure the cavity remains dust and moisture-free.
  • Blind Retrofit:
    • Identify and replace failed motors with compatible high-quality alternatives (e.g., Somfy, Elero) that fit the existing Warema headrails.
    • Replace worn lift tapes and ladder cords as necessary to ensure smooth mechanical operation.

6. Commissioning & Integration

  • Calibration: Set electronic end-limits (upper/lower) for every unit.
  • Testing: Perform three full cycles (Up/Down/Tilt) per window to ensure defect-free operation.
  • System Integration: Ensure new motors are integrated into the existing building control or radio systems.

7. Waste Disposal (Swiss Compliance)

  • Swiss Codes: Disposal must comply with vREG/ORDEA (Electrical Waste) and VeVA/OMW (Waste Movements).
  • Recycling: Deliver old motors and aluminum scrap to authorized SENS eRecycling or Swico collection points.
  • Evidence: Contractor shall provide official disposal certificates (Entsorgungsnachweis).

8. Cleaning & Handover

  • Internal Cleaning: Clean internal glass surfaces and aluminum slats before closing the sash.
  • Final Report: Provide a list of all units serviced, including specific motor model numbers used.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 14, 2026

    Special notice

    Due August 5, 2026 at 10:00 AM EDT. SAM.gov, notice 3931d3297035475db81fe1875d053b04

    1 revisions on SAM
    • July 14, 2026: publish, special notice

Points of contact