Solicitation
Request for Quotes (RFQ) to upgrade security lights at U.S. Government residence 10/316.
PR15755127
Department of State, U.S. Embassy Lilongwe. Electrical Contractors and Other Wiring Installation Contractors.
Response deadline
April 27, 2026 at 8:00 AM EDT
Closed 188 days ago. Posted April 10, 2026. Scheduled to archive April 27, 2026.
Get the next one like this from Department of State by email, the day it is posted.Find my opportunities
This one closed in 2026
38 like it are open now in electrical contractors and other wiring installation contractors
- CLWTP FISMA Compliance
Departmental Offices, Reclamation Contracting Activity
SolicitationNAICS 238210Location not published140R4026Q0108Closes in 5 daysNov 6 - Havasupai Elementary School - Urgent Fire Alarm
Bureau of Indian Affairs, Indian Education Acquisition Office
SolicitationNAICS 238210Location not published140A2326Q0183Closes in 6 daysNov 7 - NHOTIC AV SYSTEM REPLACEMENT
Bureau of Land Management, Oregon State Office
SolicitationSmall businessNAICS 238210Location not published140L4326Q0126Closes in 20 daysNov 21
All 38 open in electrical contractors and other wiring installation contractors
Description
As published on SAM.gov.
The proposals from General Contractors to upgrade security lights at U.S. Government residence 10/316 includes:
-
- Supply and installation of double tube weatherproof light fittings with 2 tube lights on each at 3 meters heights (Phillips, FSL or radiant brand).
- Supplying and installation of 2.5 mm by 3 core armored cables (about 50 meter) as well as associated accessories (watertight junction boxes, compression glands, flex cables, wire nuts, etc.) to tap power from the nearest light pole to the nearest light point.
- Supplying and installation of 250 meters by 2.5 mm single core cables (RGB) and associated accessories (20 mm PVC pipes, copulins, nipples, round boxes, round covers).
- Wall chasing works all along the 250 meters stretch.
- Masonry works, gardening works and painting for restoration of affected walls and the lawn.
- Trenching will be done to 70 cm deep and a caution tape will be laid 10 cm above the cable.
Work shall be carried out in conformance with this Statement of Work (SOW) and Specifications, General Conditions, and the Contract Terms and Conditions. If there is a conflict between the documents, the Contractor shall follow the more stringent requirement.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- SOW Upgrade to CMR Security Light Instalation Project.pdf800 KB, April 10, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 10, 2026
Solicitation
Due April 27, 2026 at 8:00 AM EDT. SAM.gov, notice 74ee4dad73a4435a8441b3a19c9cd021
1 revisions on SAM
- April 10, 2026: publish, solicitation
Points of contact
- Karen CoulsonLilongweGSOProcurement@State.gov0888760176