Skip to content
  • 7,006 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Sources sought, total small business set-aside

PIP-II CDS Tunnel Warm Piping Installation

PIPII-366552-STE

Department of Energy, Fermilab - DOE Contractor. Plumbing, Heating, and Air-Conditioning Contractors.

Response deadline

June 5, 2025 at 4:00 PM EDT

Closed 517 days ago. Posted May 28, 2025. Scheduled to archive June 5, 2025.

Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities

This one closed in 2025

47 like it are open now in plumbing, heating, and air-conditioning contractors

All 47 open in plumbing, heating, and air-conditioning contractors

Description

As published on SAM.gov.

THIS IS A SOURCES SOUGHT NOTICE TO GAUGE INTEREST IN A SOLICIATION THAT'S ANTICIPATED TO BE RELEASED THIS SUMMER. THIS IS NOT A SOLICITATION. IF YOU ARE INTERESTED IN RECEVING A SOLICITATION AND MEET SAFETY, BONDING, INSURANCE AND TECHNICAL REQUIREMENTS, PLEASE EMAIL YOUR INTEREST TO SANDRAEF@FNAL.GOV.

NOTE: THE ATTACHED SPECIFICATION AND DRAWINGS MAY CHANGE PRIOR TO ISSUANCE OF THE SOLICITATION. The Proton Improvement Plan-II (PIP-II) is Fermi National Accelerator Laboratory’s (FNAL) plan for providing powerful, high-intensity proton beams to the laboratory's research program which includes an 800 MeV superconducting linac. In support of this program, the PIP-II project requires a new cryogenic distribution system (CDS).

The Warm Piping System of CDS will provide room temperature helium gas to the PIP-II accelerator as well as recover and transport cold helium gas from the accelerator following a pressure relief event. This specification provides the basis for the piping installation contract for a portion of the CDS Warm Piping System. The scope of this specification shall be limited to the CDS Warm Piping system located in the accelerator tunnel. The piping system described in the specification will reside within the PIP-II Linac Tunnel, see attached SOW and drawing for more information.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 28, 2025

    Sources sought

    Due June 5, 2025 at 4:00 PM EDT. SAM.gov, notice 2626ffd0c3f74831b5fe88757dc88bca

Points of contact