Sources sought, total small business set-aside
PIP-II CDS Tunnel Warm Piping Installation
PIPII-366552-STE
Department of Energy, Fermilab - DOE Contractor. Plumbing, Heating, and Air-Conditioning Contractors.
Response deadline
June 5, 2025 at 4:00 PM EDT
Closed 517 days ago. Posted May 28, 2025. Scheduled to archive June 5, 2025.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2025
47 like it are open now in plumbing, heating, and air-conditioning contractors
- Condenser Coils Replacement for the VA Illiana Health Care System (VAIHCS), located at 1900 E. Main Street, Danville, IL 61832.
Department of Veterans Affairs, 252-Network Contract Office 12
SolicitationSDVOSBNAICS 238220Illinois36C25227Q0051Closes todayNov 4 - Damen Sump Pump Control System Repair
Department of Veterans Affairs, 252-Network Contract Office 12
Sources soughtNAICS 238220Illinois36C25227Q0074Closes in 3 daysNov 7 - Damen Building Vacuum Condensate System Rebuild
Department of Veterans Affairs, 252-Network Contract Office 12
Sources soughtNAICS 238220Illinois36C25227Q0083Closes in 9 daysNov 13
All 47 open in plumbing, heating, and air-conditioning contractors
Description
As published on SAM.gov.
THIS IS A SOURCES SOUGHT NOTICE TO GAUGE INTEREST IN A SOLICIATION THAT'S ANTICIPATED TO BE RELEASED THIS SUMMER. THIS IS NOT A SOLICITATION. IF YOU ARE INTERESTED IN RECEVING A SOLICITATION AND MEET SAFETY, BONDING, INSURANCE AND TECHNICAL REQUIREMENTS, PLEASE EMAIL YOUR INTEREST TO SANDRAEF@FNAL.GOV.
NOTE: THE ATTACHED SPECIFICATION AND DRAWINGS MAY CHANGE PRIOR TO ISSUANCE OF THE SOLICITATION. The Proton Improvement Plan-II (PIP-II) is Fermi National Accelerator Laboratory’s (FNAL) plan for providing powerful, high-intensity proton beams to the laboratory's research program which includes an 800 MeV superconducting linac. In support of this program, the PIP-II project requires a new cryogenic distribution system (CDS).
The Warm Piping System of CDS will provide room temperature helium gas to the PIP-II accelerator as well as recover and transport cold helium gas from the accelerator following a pressure relief event. This specification provides the basis for the piping installation contract for a portion of the CDS Warm Piping System. The scope of this specification shall be limited to the CDS Warm Piping system located in the accelerator tunnel. The piping system described in the specification will reside within the PIP-II Linac Tunnel, see attached SOW and drawing for more information.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 28, 2025
Sources sought
Due June 5, 2025 at 4:00 PM EDT. SAM.gov, notice 2626ffd0c3f74831b5fe88757dc88bca
Points of contact
- Sandra Efstathiousandraef@fnal.gov6308405784