Skip to content
  • 6,813 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Combined synopsis and solicitation

USCG KETCHIKAN ELECTRICAL WORK

PierOneBaseKetchikan

US Coast Guard, Base Ketchikan. Electrical Contractors and Other Wiring Installation Contractors.

Response deadline

March 13, 2026 at 3:00 PM EDT

Closed 233 days ago. Posted February 26, 2026, first published February 17, 2026. Scheduled to archive March 28, 2026.

Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities

This one closed in 2026

38 like it are open now in electrical contractors and other wiring installation contractors

All 38 open in electrical contractors and other wiring installation contractors

Description

As published on SAM.gov.

EXTENDED PROPOSAL DUE DATE OUT TO 13 MARCH 2026 AT 3:00 PM ALASKA TIME

SEE ATTACHED SPECS/SCOPE OF WORK---- 

Scope of Work: Electrical Inspection and Maintenance – Floating Pier One, Base Ketchikan

1. Objective:
Provide inspection, maintenance, and repair services for electrical systems associated with Floating Pier One, Base Ketchikan, with a focus on shore tie terminals and associated electrical lines.

2. Location:
Floating Pier One, Base Ketchikan. Berth 5

3. Tasks:

A. Shore Tie Terminal Maintenance

  • Inspect all shore tie terminals where vessels connect to shore power.
  • Identify and document any damage, corrosion, moisture intrusion, or other deficiencies.
  • Repair any identified issues to restore full functionality.
  • Dry and seal all shore tie terminals to prevent future moisture intrusion.
  • Test terminals for proper operation after repairs and sealing.

B. Electrical Line Inspection and Grooming

  • Inspect the electrical line running from the FRC Floating Pier Isolation Transfer to the shore tie terminals.
  • Clean and groom all accessible portions of the line, removing debris, corrosion, and contaminants.
  • Conduct a thorough inspection for physical damage, wear, or potential failure points.
  • Perform Megger (insulation resistance) testing on the electrical lines to identify any insulation breakdowns or other potential issues.
  • Document all findings and provide recommendations for further action if required.

4. Deliverables:

  • Written inspection report detailing findings, repairs performed, and recommendations for future maintenance.
  • Documentation of Megger test results and any corrective actions taken.
  • Photographic evidence of before and after conditions for all work performed.

5. Period of Performance:

  • Shore Tie Terminal inspection and maintenance shall be completed within two (2) weeks from award of contract.
  • Electrical line inspection, grooming, and cleaning shall be completed within three (3) weeks from award of contract.
  • Final written report of findings and actions  written(typed)  and documented shall be submitted within one (1) month from the start of the period of performance.

6. Safety and Compliance:

  • All work must comply with applicable electrical codes, safety standards, and Base Ketchikan requirements.
  • All personnel must be appropriately licensed and qualified for marine electrical work.

Quote/Estimate: Quote or Estimate shall include materials going up to 5,000K for any repairs in the shore tie terminal box on the floating pier, but not to exceed.

Question: Could you quantify the shore tie terminals and cable lengths from Isolation Transfer to each Terminal to refine labor/testing time.

answer to a contractors question 1.  

Good Afternoon Contracting Team,

The Shore tie Terminals is one box that has two plugs for shore ties. Approximate size is 4’x4’x2’ Not exact size of the box, but approximate.  

Approximate distance of the cable/ conduit run is 550’ plus or mins 20 feet.

Area of Concern: On map, it is South Float One (Berth 5 and Berth 10).

Base Ketchikan POC: LT Robert Marx and CWO Russell Dever.

***contact Senior Field Contracting Officer (SFCO ) DENO STAMOS AT  deno.a.stamos@uscg.mil if a site walk is required .

THIS IS A COMBINED SYNOPSIS SOLICIATION. RECEIPT OF BIDS VIA EMAIL IS DUE NO LATER THAN 26 FEBRUARY 2026 AT 3:00 PM ALASKA TIME ZONE,

NAICS  CODE: 238210
 FSC CODE:J059

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. February 17, 2026

    Combined synopsis and solicitation

    Due February 27, 2026 at 3:00 PM EST. SAM.gov, notice f971aa4f4a974bab9db20de6d4f680a4

    3 revisions on SAM
    • February 26, 2026: publish, combined synopsis and solicitation
    • February 19, 2026: publish, combined synopsis and solicitation
    • February 17, 2026: publish, combined synopsis and solicitation
  2. February 19, 2026

    Combined synopsis and solicitation

    Due February 27, 2026 at 3:00 PM EST. SAM.gov, notice f50983080a8d481abde0539caf6e145e

    3 revisions on SAM
    • February 26, 2026: publish, combined synopsis and solicitation
    • February 19, 2026: publish, combined synopsis and solicitation
    • February 17, 2026: publish, combined synopsis and solicitation
  3. February 26, 2026

    Combined synopsis and solicitation

    Due March 13, 2026 at 3:00 PM EDT. SAM.gov, notice d1cef63b3fdd40ce8c98cc4572b6adb8

    3 revisions on SAM
    • February 26, 2026: publish, combined synopsis and solicitation
    • February 19, 2026: publish, combined synopsis and solicitation
    • February 17, 2026: publish, combined synopsis and solicitation

Points of contact