Skip to content
  • 6,814 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Sources sought

Request for Information for PFAS Contaminated Soil Disposal Services

PDPG262400

Department of the Air Force, FA4664 452 MSG PK. Remediation Services.

Response deadline

August 20, 2026 at 10:00 AM EDT

Closed 73 days ago. Posted August 10, 2026, first published July 16, 2026. Scheduled to archive September 4, 2026.

Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities

This one closed in 2026

23 like it are open now in remediation services

All 23 open in remediation services

Description

As published on SAM.gov.

General Information

  • Project Title: WMWD Sewer Rehabilitation Project - PFAS Groundwater Soil Contamination

  • Project Number: PDPG26-2400

  • Location: 452d Civil Engineer Squadron, March Air Reserve Base (ARB), California

  • NAICS Code: 562910 - Remediation Services

  • Product Service Code (PSC): F108 - Environmental Systems Protection - Environmental Remediation

Project Description

The 452d Civil Engineer Squadron at March Air Reserve Base (ARB), California, has a requirement for environmental remediation and construction disposal services. The primary scope of this project, designated as Project No. PDPG26-2400, is the safe handling, testing, transportation, and disposal of PFAS-contaminated soil resulting from the WMWD Sewer Rehabilitation Project.

The Contractor shall provide all equipment, labor, and supervision necessary to perform these services in strict accordance with Air Force technical guidelines, as well as federal, state, and local environmental regulations.

Scope of Work & Key Requirements

1. On-Site Handling and Storage

  • Stockpile Control: Contractors must implement Best Management Practices (BMPs) to prevent cross-contamination and runoff. All soil piles must be securely covered with plastic sheeting or tarps and surrounded by containment berms.

  • Storage Limits: Non-RCRA contaminated soil may only be accumulated on-site for a maximum of 90 days. All temporary stockpiles must be placed on impermeable surfaces (such as HDPE liners) prior to transport.

  • Air Monitoring: Continuous dust and air quality monitoring is mandatory during all excavation and loading operations.

2. Testing and Hazard Classification

  • Representative soil samples must be obtained and analyzed at a certified laboratory prior to any off-site transport or disposal. No material may be moved for reuse or disposal until test results are approved.

  • Excavated soil must be classified according to hazardous waste regulations, specifically differentiating between:

    • RCRA Hazardous: Soil exceeding federal EPA toxicity thresholds (e.g., highly toxic, corrosive, or reactive). This material must be disposed of in a specialized Class I hazardous waste landfill.

    • California Hazardous (Non-RCRA): Soil containing specific chemicals at levels exceeding California's Title 22 limits.

3. Transportation and Tracking

  • Manifesting: All hazardous shipments must be strictly tracked, documented, and legally compliant using the state's hazardous waste manifest tracking system.

  • Haulers: Transportation of contaminated soil must be conducted exclusively by registered and licensed hazardous waste transporters.

  • Decontamination: All transport vehicles and trucks must undergo thorough decontamination procedures before exiting the project site to prevent the off-site tracking of hazardous materials.

Regulatory and Compliance Requirements

Work must strictly comply with all applicable federal, state, and local statutes, including but not limited to:

  • Unified Facilities Criteria (UFC)

  • Occupational Safety & Health Administration (OSHA) Regulations and Safety Standards

  • March ARB Environmental Protection Guide (Specification 01 57 19 Temporary Environmental Controls)

  • California Department of Environmental Protection Rules and Regulations

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 16, 2026

    Sources sought

    Due July 27, 2026 at 10:00 AM EDT. SAM.gov, notice ec34eca6eed14bc69ec4a9edbcaf99cb

    3 revisions on SAM
    • August 10, 2026: publish, sources sought
    • July 17, 2026: publish, sources sought
    • July 16, 2026: publish, sources sought
  2. July 17, 2026

    Sources sought

    Due July 27, 2026 at 10:00 AM EDT. SAM.gov, notice 8257a7513ca045fdaad3631b9cf65f73

    3 revisions on SAM
    • August 10, 2026: publish, sources sought
    • July 17, 2026: publish, sources sought
    • July 16, 2026: publish, sources sought
  3. August 10, 2026

    Sources sought

    Due August 20, 2026 at 10:00 AM EDT. SAM.gov, notice 4bacc27beb554afa8abf3ae3ff212a17

    3 revisions on SAM
    • August 10, 2026: publish, sources sought
    • July 17, 2026: publish, sources sought
    • July 16, 2026: publish, sources sought

Points of contact