FY25 Electric Vehicle Charging Facility on Red River Army Depot, Texas

PANSWD24P0000003213

Department of the Army, W076 Endist FT Worth. Electrical Contractors and Other Wiring Installation Contractors.

Response deadline

November 14, 2024 at 5:00 PM EST

Closed 672 days ago. Posted November 1, 2024. Scheduled to archive November 15, 2024.

Description

As published on SAM.gov.

This project will provide 22 charging hubs dispersed across Red River Army Depot (RRAD). These hubs will provide an aggregate of 50 Level 2 grid-tied chargers to serve a fleet of about 171 ZEVs. Electric Chargers must meet FedRamp Certification and be compatible with a Wex card for integration. The contractor will be responsible for the installation of EV chargers, utility connections, and trenching, and will coordinate with RRAD to complete commissioning requirements. RRAD will provide through a separate service contract the network plan & data package required to operate the selected EV Charger installed on-site.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. November 1, 2024

    Sources sought

    Due November 14, 2024 at 5:00 PM EST. SAM.gov, notice c7fd337e7d4a47bcb361be41494edbac