Solicitation, first published as special notice
Closed-Circuit Wind Tunnel (24-inch test)
PANRSA-26-P-0000-037658
Department of the Army, W6QK ACC-RSA. Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology).
Response deadline
August 7, 2026 at 4:30 PM EDT
Closed 86 days ago. Posted August 3, 2026, first published June 29, 2026. Scheduled to archive August 22, 2026.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2026
127 like it are open now in research and development in the physical, engineering, and life sciences (except nanotechnology and biotechnology)
- Space Communications and Networking (SCaN) & Tracking and Data Relay Satellite System (TDRS) Support
National Aeronautics and Space Administration, NASA Marshall Space Flight Center
Sources soughtNAICS 541715Huntsville, AL80MSFC27ENG1026Closes in 4 daysNov 5 - Mentor Protégé Program Broad Agency Announcement
Missile Defense Agency (Mda), Missile Defense Agency (Mda)
Sources soughtNAICS 541715Redstone Arsenal, ALHQ0858-25-S-0001Closes in 668 daysAug 30, 2028 - Federal Aviation Administration (FAA) Research And Commercial Solutions Opening (RCSO) Area Of Interest (AOI) - Complexity Of Systems And Operations
Federal Aviation Administration, 693KA8 System Operations Contracts
SolicitationNAICS 541715Washington, DC693KA8-27-T-00003Closes tomorrowNov 2
Description
As published on SAM.gov.
The Closed-Circuit Wind Tunnel (24-inch test) shall include the following specifications or equivalent (if not brand name):
Requirements:
- This wind tunnel must be a closed circuit, as the operation of an LDV system requires seed particles to be added to the air stream – in this case, a substance called Bis(2-ethylhexyl) subacute. The wind tunnel thus needs to be fitted with a 3/8-inch Swagelok bulkhead fitting placed upstream of the test and transitional sections.
- This wind tunnel must have a maximum operating speed of approximately 50 meters per second (~9900 feet per minute). The test section walls must have 25.908 millimeter (~1.02-inch)-thick grooves placed at approximately 90 percent of the total length of the test section as measured from the entrance in which specialized nozzle restriction plates can be affixed to adjust the operating range and achieve an air speed of 0.15 meters per second (~30 feet per minute). The typical turbulence intensity across this operating range must be less than 1 percent, where turbulence intensity is defined as the root-mean-square of velocity fluctuations divided by the average test section velocity.
- This wind tunnel must have a test section height and width of 60.96 centimeters by 60.96 centimeters (~24 inches by 24 inches). Test section length can vary if the design meets the following requirements: The test section must have at least two sealable ports or fittings for the insertion of instruments of various sizes, such as Pitot-static tubes and hotwire anemometers. These ports or fittings must accommodate the following instrument diameters: 4.3 mm (~0.188 in); 6.3 mm (0.25 in); 7.9 mm (0.313 in); 9.5 mm (0.375 in); 10.1 mm (0.4 in); 12.7 mm (0.5 in); 15.9 mm (0.625 in). The test section must also be designed such that a 15-inch section of the usable test area located approximately 6 inches upstream of the nozzle restriction plates can be replaced with a test item without introducing any leaks into the circuit. The total footprint of the tunnel and all associated systems must not be larger than 32 feet in length, 8 feet in width and 7.5 feet in height. Additionally, portions of the test section sidewalls must be made of optical-quality glass to minimize interference with laser propagation. The argon-ion continuous-wave laser used in this application has a max wavelength of 532 nanometers and 500 milliwatts output power.
- The wind tunnel must have a centrifugal fan design. The fan should be isolated from the rest of the tunnel system to minimize vibration. The fan must be controlled by a variable-frequency drive (VFD) connected to a motor of appropriate size and power to meet the air speed requirements listed above. The VFD must be implemented such that an operator could use computer software or manual input to control the drive and automate its function. The computer-VFD interface must not rely on internet or wireless connections, such as Bluetooth or WiFi. This interface must be programmable via National Instruments’ LabVIEW software.
- Any design submitted must be shown to meet the specific air speed and turbulence requirements listed above through a quantitative analysis, such as by computational fluid dynamics (CFD) simulations or other appropriate methods.
-------------------------------------------------------------------------
Delivery Location/Address: U.S. Army TMDE Activity, Attn: Michael Tyler, Building 5435 Fowler Road, Redstone Arsenal, AL 35898
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Purchase Description_Wind Tunnel (24 inch test).pdf111 KB, August 3, 2026
- Request for Information (W80RA6-19-26C).docx23 KB, June 29, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 29, 2026
Special notice
Closed Circuit Wind Tunnel
Due July 15, 2026 at 5:00 PM EDT. SAM.gov, notice 9a1f4f6ec08d46e4a15c79a6ca75fa3e
1 revisions on SAM
- June 29, 2026: publish, special notice
August 3, 2026
Solicitation
Due August 7, 2026 at 4:30 PM EDT. SAM.gov, notice 6f61d8a4d6554834a587a18dae7e1cd7
1 revisions on SAM
- August 3, 2026: publish, solicitation
Points of contact
- Samantha Shirleysamantha.c.shirley.civ@army.mil
- Lisa Armeslisa.s.armes.civ@army.mil