Skip to content
  • 6,814 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Sources sought

Rogue River South Jetty Partial Repair 2025

PANNWD2002246

Department of the Army, W071 Endist Portland. Other Heavy and Civil Engineering Construction.

Response deadline

May 4, 2025 at 3:00 PM EDT

Closed 546 days ago. Posted April 23, 2025, first published April 14, 2025. Scheduled to archive May 19, 2025.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2025

132 like it are open now in other heavy and civil engineering construction

All 132 open in other heavy and civil engineering construction

Description

As published on SAM.gov.

The project is located on the Southern Oregon Coast at the inlet to Rogue River in Gold Beach, Curry County, Oregon. The project consists of procurement, delivery, and placement of jetty armor stone between stations 7+10 and 10+80. The mandatory work includes toe and side slope repairs to address a channel-side damage zone from 8+20 to 9+80 with a 50-foot buffer on either side for a total construction length of approximately 260 ft.

Optional repairs include an additional 60 ft of repair from 7+60 to 8+20 and reworking the jetty from 9+80 to 10+30. Due to apparent instability of the core and lack of interlocking on the south side of the cross-section, rework and/or reconstruction of the full cross-section may be needed along at least a partial length of the mandatory repair zone. To accomplish that effectively, the toe of the jetty on the south side may need to be excavated and the stone/cross-section reset.

Design stone W50 is 18 tons, with a minimum density of 170 pcf. The repair work is expected to be carried out between August 2025 and January 2026. Attached drawings are DRAFT copies only and are not the FINAL DESIGN. They are for reference only at this time and will change before solicitation.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. April 14, 2025

    Sources sought

    Due May 4, 2025 at 3:00 PM EDT. SAM.gov, notice 84e3be8336204fee8adc45b5b3769740

  2. April 15, 2025

    Sources sought

    Due May 4, 2025 at 3:00 PM EDT. SAM.gov, notice 5d01dcd7f5c44ce88542d716534113b1

  3. April 23, 2025

    Sources sought

    Due May 4, 2025 at 3:00 PM EDT. SAM.gov, notice b91975742005467eaf7d25323cabc17e

Points of contact