Sources sought
Project Labor Agreement (PLA) Request for Information (RFI) for Construction Project for Building and/or Heavy (non-building/residential) Requirements P859 Aircraft Carrier Electrical Upgrades, Naval Base Kitsap (NBK) Bremerton, WA Naval Facilities Engine
P859_PLA_RFI
Department of the Navy, Navfacsyscom Northwest. Power and Communication Line and Related Structures Construction.
Response deadline
June 25, 2025 at 3:00 PM EDT
Closed 449 days ago. Posted June 18, 2025, first published June 18, 2025. Scheduled to archive July 10, 2025.
Description
As published on SAM.gov.
This is a request for information/market survey. This is not a request for proposal, request for quote, or an invitation for bid. There will be no solicitation, specification, or drawings available at this time.
Description: Naval Facilities Engineering Systems Command (NAVFAC), Northwest is soliciting comments from the public addressing the potential use of Project Labor Agreements (PLA) for the following construction project. The construction project is for Building and/or Heavy (non-building/residential) requirements in support of P859 CVN 78 Aircraft Carrier Electrical Upgrades, Naval Base Kitsap (NBK) Bremerton, Puget Sound Naval Shipyard (PSNS), located in the State of Washington. The designated Defense Priorities and Allocation System (DPAS) priority rating for this project is DX-C2. Construction may include, but is not limited to:
demolition of an existing substation and the construction of a new substation at a different locations; construction of a new substation building made of concrete and steel that houses indoor switchgear, battery banks, an office, restroom facilities, fire protection, and HVAC; electrical, civil, and structural work required to upgrade power connections to accommodate simultaneous mooring; Antiterrorism (AT) features; pile wall reinforcement and transformer fire separation wall; foundations made of concrete for exterior electrical equipment and secondary containment systems, such as transformers, circuit breakers, and disconnect switches; electrical duct banks made of concrete-encased polyvinyl chloride (PVC) conduits that connect the new substation to the existing kilovolt (kV) transmission line and the shipyard distribution system; site preparation including site clearing, excavation and grading, and removal and disposal of hazardous material and contaminated soil; pavement resurfacing and site improvements; electrical utilities; mechanical utilities including storm water, sanitary sewer, water distribution and compressed air distribution to supply the substation buildings. Project will be design-bid-build (DBB).
NAICS Code: 237130. In accordance with DFARS 236.204, the magnitude of construction is anticipated to be between $100,000,000 and $250,000,000. The general period of performance is anticipated to be approximately 2,000 calendar days. A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement as described in 29 U.S.C. 158 (f).
Federal Acquisition Regulation (FAR) policy states: Executive Order (E.O.) 14063, Use of Project Labor Agreements for Federal Construction Projects, requires agencies to use PLAs in large-scale construction projects (defined as a construction projects with a total estimated cost at or above $35M) to promote economy and efficiency in the administration and completion of Federal construction projects.
When awarding a contract in connection with a large-scale construction project, agencies shall require use of a PLA for contractors and subcontractors engaged in construction on the project, unless an exception(s) at FAR 22.504(d) applies. Reference is made to:
FAR Subpart 22.5 Use of Project Labor Agreements for Federal Construction Projects; provision, FAR 52.222-33 Notice of Requirement for Project Labor Agreement; and to clause, FAR 52.222-34 Project Labor Agreement. In consideration of the above factors, and any others which may be deemed appropriate, the public is invited to provide responses on the use of a PLA for this construction project utilizing the attached questionnaire.
In light of recent court decisions on PLAs, the Government is seeking additional information on the use of PLAs for this project. This survey is for planning purposes only and shall not be construed as an obligation on the part of the Government. The Government does not intend to award a contract on the basis of this market survey or otherwise pay for the requested information. The Government will not provide a debriefing on the results of this survey. All information will be held in a confidential manner and will only be used for the purposes intended.
Submission Instructions: Responses shall be submitted on the attached questionnaire via email to sylva.kabuanseya.civ@us.navy.mil and grace.e.montero.civ@us.navy.mil no later than 12:00 p.m. PDT, 25 June 2025. Please title the subject line of your e-mail as “(Insert Company Name) – P859 PLA RFI Questionnaire – N4425525R1500”. Emails can be no larger than 5 MB in size. If more than 5 megabytes are needed, more than one email may be sent.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 18, 2025
Sources sought
Due June 25, 2025 at 3:00 PM EDT. SAM.gov, notice 2a5d8a774e0442119af754775d3d522e
June 18, 2025
Sources sought
Due July 18, 2025 at 3:00 PM EDT. SAM.gov, notice b9cd1ce1d7784dd78831f223b1d7e716
June 18, 2025
Sources sought
Due June 25, 2025 at 3:00 PM EDT. SAM.gov, notice e9406c8beeaa43aba7135544219329b8
Points of contact
- Sylva Kabuanseyasylva.kabuanseya.civ@us.navy.mil
- Nancy Coffeenancy.m.coffee.civ@us.navy.mil
Also open from this buyer
- JACE - Supervisory Controller Upgrade and InstallationSolicitationSmall businessNAICS 238210N4425526R0006Closes tomorrowSep 18