Solicitation
Shield Block Transportation RFP
NSCF-373754-SH
Department of Energy, Fermilab - DOE Contractor. General Freight Trucking.
Response deadline
October 17, 2025 at 6:00 PM EDT
Closed 380 days ago. Posted October 14, 2025, first published October 1, 2025. Scheduled to archive November 1, 2025.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
Description
As published on SAM.gov.
Amendment #2 and RFP No. NSCF-373754-SH rev attached issued on 14-OCT-2025
Amendment #1 issued on 07-OCT-2025
The scope includes the transportation of shield blocks from Energy Solutions, Oak Ridge, Tennessee, to Fermilab, Batavia, Illinois, in accordance with the requirements of Fermilab, Energy Solutions, and all federal, state, and local regulations.
Shield blocks shall be loaded, blocked, and braced in accordance with the Energy Solutions Loading, Blocking and Bracing Plan For Shield Block plan, Revision 0.
Fermilab will offload the shielding blocks at Fermilab.
Each load shall include two shield blocks.
Shield Blocks are produced from reclaimed steel and their availability is dependent on source material availability and Energy Solutions’ production schedule. Therefore, during periods when shield blocks are available, they are typically transported at the rate of two-to-four loads per week.
Transit time expectation is 24 hours. Delivery to Fermilab, Batavia, Illinois will be accepted between the hours of 7:00 AM and 11:30 AM or 12:30 PM and 13:30 PM Central Standard Time. Preferred delivery day is Thursday however consideration for an alternate day may be made on a case-by-case basis. Drivers must have a valid driver’s license for Fermi site access and weapons are not allowed on-site. To gain access to the Energy Solutions site, any visitor that is a foreign national is required to present a current TWIC Card, current FAST Card, current Employment VISA, or current Permanent Resident Card (green card) upon each visit.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- K Section Attachments.zip943 KB, October 1, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
October 1, 2025
Solicitation
Due October 15, 2025 at 6:00 PM EDT. SAM.gov, notice d2312771a81b4c959b97abcd5f76ef5a
3 revisions on SAM
- October 14, 2025: publish, solicitation
- October 7, 2025: publish, solicitation
- October 1, 2025: publish, solicitation
October 7, 2025
Solicitation
Due October 15, 2025 at 6:00 PM EDT. SAM.gov, notice 337357bc8ac34039a618f1732301e348
3 revisions on SAM
- October 14, 2025: publish, solicitation
- October 7, 2025: publish, solicitation
- October 1, 2025: publish, solicitation
October 14, 2025
Solicitation
Due October 17, 2025 at 6:00 PM EDT. SAM.gov, notice dbdb112dfd3441a78928807396949846
3 revisions on SAM
- October 14, 2025: publish, solicitation
- October 7, 2025: publish, solicitation
- October 1, 2025: publish, solicitation
Points of contact
- Sharlene Hortonshorton@fnal.gov6308402407
- Craig Schmitzschmitzc@fnal.gov6309920933