Sources sought, total small business set-aside
NIST Boulder Galvanized Steel Stair Installation – Building 2 Mechanical Room
NB194000-26-00857
National Institute of Standards and Technology, Department of Commerce NIST. Commercial and Institutional Building Construction.
Response deadline
March 27, 2026 at 7:00 PM EDT
Closed 225 days ago. Posted March 13, 2026. Scheduled to archive April 11, 2026.
Get the next one like this from National Institute of Standards and Technology by email, the day it is posted.Find my opportunities
This one closed in 2026
189 like it are open now in commercial and institutional building construction
- Remove and Replace Carpet-Rooms 127 and 137 at the United States Customs House Denver CO
Public Buildings Service, PBS Project Delivery West - Branch a
PresolicitationWOSBNAICS 236220Denver, CO47PD5127Q9987Closes in 3 daysNov 10 - DFC Bldg. 56 Clean Room - Design/Build
Public Buildings Service, PBS Project Delivery West - Branch a
Combined synopsis and solicitationNAICS 236220Lakewood, CO47PD5127Q9995Closes in 10 daysNov 17 - Denver, CO Denver P&DC Roof Replacement K95856
Postal Service, Supplies Material MGMT
SolicitationNAICS 236220Denver, CO089495-27-A-0001Closes in 13 daysNov 20
All 189 open in commercial and institutional building construction
Description
As published on SAM.gov.
The National Institute of Standards and Technology (NIST) Boulder Campus seeks qualified small business contractors capable of performing a construction project to remove and replace two existing stair assemblies located in the lower-level mechanical room of Building 2. Work includes demolition and legal disposal of one (1) existing 5-riser wooden staircase and one (1) existing 9-riser wooden staircase and fabrication and installation of new galvanized steel stair assemblies. Due to restricted access within the mechanical room, the stair assemblies must be field-fabricated and installed in place, including required on-site welding. The new stair systems shall include slip-resistant industrial treads and code-compliant handrails and guardrails, and shall be securely anchored to the existing structure. Work also includes coordination with existing mechanical, electrical, and plumbing systems; protection of adjacent surfaces; cleanup and debris removal; and compliance with applicable building codes, OSHA regulations, and NIST safety and security requirements.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 05 NIST Boulder General Contractor Requirements - Rev C.docx599 KB, March 13, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 13, 2026
Sources sought
Due March 27, 2026 at 7:00 PM EDT. SAM.gov, notice 06a9d8f39b64473398fd5218fe2e0d1c
2 revisions on SAM
- April 13, 2026: publish, solicitation
- March 13, 2026: publish, sources sought
Points of contact
- Lauren Lopezlauren.lopez@nist.gov
- Travis Zoellnertravis.zoellner@nist.gov