Special notice
Sole Source - COMFRC Procurement Group - Hydrogen Embrittlement Load Frame
N6852027Q1006
Department of the Navy, Fleet Readiness Center. Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology).
Response deadline
November 8, 2026 at 2:00 PM EST
Closed in 8 days. Posted October 29, 2026. Scheduled to archive November 23, 2026.
Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities
This one closed in 8 days
127 like it are open now in research and development in the physical, engineering, and life sciences (except nanotechnology and biotechnology)
- RTI Connext Site License Renewal
National Aeronautics and Space Administration, NASA IT Procurement Office
PresolicitationNAICS 541715Florida80TECH27QA010Closes in 7 daysNov 7 - Federal Aviation Administration (FAA) Research And Commercial Solutions Opening (RCSO) Area Of Interest (AOI) - Complexity Of Systems And Operations
Federal Aviation Administration, 693KA8 System Operations Contracts
SolicitationNAICS 541715Washington, DC693KA8-27-T-00003Closes in 2 daysNov 2 - Evaluations, Assessments, and Support Services (EASS)
National Aeronautics and Space Administration, NASA Langley Research Center
PresolicitationSmall businessNAICS 541715Hampton, VA80LARC27R0003Closes in 3 daysNov 3
Description
As published on SAM.gov.
The Commander Fleet Readiness Centers (COMFRC) Procurement Group, Patuxent River, MD 20670 hereby gives notice of their intent to award a purchase order to Laboratory Testing LLC, DBA Assured Testing Services[R(1] , 388 Servidea Dr. Ridgway, PA (CAGE: 25WT7) on a sole source basis in accordance with Federal Acquisition Regulation (FAR) Subpart 12.102(a), only one source reasonably available and no other supplies or services will satisfy agency requirements.
The Material Engineering Division at Fleet Readiness Center Southeast (FRSCE), Naval Air Station Jacksonville, FL, requires the procurement of one (1) fully configured Hydrogen Embrittlement Load Frame system. This system is essential for conducting critical materials testing in strict accordance with the ASTM F519 standard to ensure material integrity and safety for mission-related applications.
The Hydrogen Embrittlement Machine is designed to perform static load testing of Type 1.a.1 test bars in accordance with ASTM F519 and features a steel constructed frame with digital control panel for intuitive operation. The HE Proof 200 – XL frame is capable of handling up to (4) sets of 1a.1 bars for easy 200-hour test setup. This includes upgraded Incremental Step Loading (ISL) package that allows for automated step loading. The ISL test profile is an automatic program that eliminates the need to for operator facilitated adjustments.
THIS NOTICE OF INTENT IS NOT A REQUEST FOR COMPETITIVE QUOTES. However, all responsible sources may submit a capability statement, which, if received within seven (7) calendar days after the date of the publication of this synopsis, will be considered. Information received will be considered solely for the purpose of determining whether to conduct a competitive procurement. A determination by the Government not to compete this requirement based upon responses received as a result of this notice is solely within the discretion of the Government.
The point of contact for this requirement is James L. Illes at james.l.illes.civ@us.navy.mil.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- N6852027Q1006.pdf1.8 MB, October 29, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
October 29, 2026
Special notice
Due November 8, 2026 at 2:00 PM EST. SAM.gov, notice e6ee121e3f484f16b7a970142aeb27e3
1 revisions on SAM
- October 29, 2026: publish, special notice
Points of contact
- James Illesjames.l.illes.civ@us.navy.mil
- Beverley Rhamdeowbeverley.s.rhamdeow.civ@us.navy.mil