Combined synopsis and solicitation, total small business set-aside
Anchors and cannons rust mitigation and transfer
N62841-25-SIMACQ-SPP-0004
Department of the Navy, Commanding Officer. All Other Specialty Trade Contractors.
Response deadline
July 24, 2025 at 10:00 AM EDT
Closed 465 days ago. Posted July 15, 2025, first published July 10, 2025. Scheduled to archive July 24, 2025.
Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities
This one closed in 2025
15 like it are open now in all other specialty trade contractors
- Crane Services
Department of the Navy, NAVSUP FLC Jacksonville Erp
Sources soughtNAICS 238990Panama City Beach, FLN6883627Q0008Closes in 3 daysNov 4 - Vertical Construction MATOC
Department of the Army, W074 Endist Mobile
SolicitationSmall businessNAICS 238990FloridaW9127826RA089Closes in 4 daysNov 5 - FTC Oklahoma City- Replace Jet Bridge
Federal Prison System / Bureau of Prisons, Fao
Sources soughtNAICS 238990Oklahoma City, OK15B51326PR000174Closes in 3 daysNov 4
Description
As published on SAM.gov.
The Naval Ordnance Test Unit (NOTU) –is issuing a combined synopsis/solicitation Notice for the rust mitigation of three anchors, two salutation cannons and the tranfer of those cannon from old trailer to a new one. This requirement is located at Cape Canaveral Space Force Station, Cape Canaveral, FL. This procurement is set-aside for small business vendors. The applicable NAICS codes is 238990 with a Small Business Size Standard of $19 Million. This effort is going to be a FIRM FIXED PRICE.
The contractor shall provide the tools, labor, materials and equipment required to complete the following scope of work: Anchors 1) Do a walk thru with client. 2) Erect a containment tent around Anchor jobsites 1, 2 and 3 as required for sand blasting. When sandblasting and mitigation process complete, containment tent will be broken down and debris will be discarded as required by CCSFS/NOTU environmental requirements. 3) Sandblast Anchor 1, 2 and 3 to remove corrosion and paint.
4) Remove the 2 compromised support bars on Anchor 1. 5) Weld in 2 new support bars on Anchor 1. 6) Complete corrosion mitigation process on Anchor 1, 2 and 3. 7) Apply 2 coats of rust resistant paint to Anchor 1, 2 coats of rust resistant paint to Anchor 2, and 2 coats of rust resistant paint to Anchor 3. 8) Apply 2 finish coats of clear paint to Anchor 1, 2 and 3. 9) Demobilize equipment and clean jobsite area of any debris and trash around Anchor 1, 2 and 3. 40MM Saluting Battery Cannons 1) Removal of two of three 40MM saluting battery cannons from existing trailer and remount cannons to 20-feet Carry-On trailer while preserving all reusable hardware applicable 2) Build a mounting system to securely affix two saluting battery cannons to new 20ft trailer securely ensuring firing force evenly distributed to prevent stress damage and instability.
3) Fabricate and install brackets, mounts, or other hardware as needed to securely mount both cannons to the flatbed trailer using heavy duty materials rated for shock load. 4) Provide rust mitigation to both cannons. 5) Paint both cannons with rust-resistant black coating. 6) Ensure mounting solution allows for safe transportation and ceremonial use of saluting cannons.
NOTE: No A/E design of the mounting bracket is required. Please see Statement of Work for further information.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- CARLOS MONTANEZcarlos.montanez@ssp.navy.mil3213996173
- Natalie Lucasnatalie.lucas@ssp.navy.mil3213996174