Sources sought
Project Labor Agreement (PLA) Request for Information (RFI) for Construction Project for Building and/or Heavy (non-building/residential) Requirements, P273 Bulk Fuel Storage Tank Hydrant System, Naval Air Station Whidbey Island (NASWI), WA
N4425524RF016
Department of the Navy, Navfacsyscom Northwest. Oil and Gas Pipeline and Related Structures Construction.
Response deadline
September 13, 2024 at 3:00 PM EDT
Closed 779 days ago. Posted August 29, 2024. Scheduled to archive September 28, 2024.
Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities
This one closed in 2024
7 like it are open now in oil and gas pipeline and related structures construction
- Gas Leak Repair, Valve Installation, and Asphalt Patching Services
US Coast Guard, Special Mission Training Center
SolicitationSmall businessNAICS 237120Birmingham, AL75110PR270000104Closes in 3 daysNov 4 - STA Sand Key Repair Fuel Lines and Tank
US Coast Guard, Base Miami Beach
Combined synopsis and solicitationSmall businessNAICS 237120Florida30321PR270000001Closes in 12 daysNov 13 - Nelson Drive Fuel Tank Removal
Forest Service, Usda-Fs, Csa Intermountain 8
Combined synopsis and solicitationSmall businessNAICS 237120Jackson, WY1240LT27Q0012Closes in 13 daysNov 14
All 7 open in oil and gas pipeline and related structures construction
Description
As published on SAM.gov.
This is a request for information/market survey. This is not a request for proposal, request for quote, or an invitation for bid. There will be no solicitation, specification, or drawings available at this time.
Description: Naval Facilities Engineering Systems Command (NAVFAC), Northwest is soliciting comments from the public addressing the potential use of Project Labor Agreements (PLA) for the following construction project. The construction project is for Building and/or Heavy (non-building/residential) requirements in support of P273 Bulk Fuel Storage Tank Hydrant System, Naval Air Station Whidbey Island (NASWI), located in Washington State. The designated Defense Priorities and Allocation System (DPAS) priority rating for this project is DO-C2. Construction may include, but is not limited to:
modification of existing fuel system to support bidirectional fuel flow and the construction of a new fuel pump house and buried fuel pipelines to support a new Type 3 hydrant system on NAS Whidbey Island.
Work elements include alteration of existing fuel and electrical infrastructure; installation of storm water systems; installation of pump house building structure; installation of fuel pumps and control systems; installation of buried stainless steel fuel piping; installation of fuel hydrant pits at airfield apron and associated repairs to flight line pavements; and commissioning of fuel systems.
This project includes work restrictions for dewatering of ground/storm water requiring containment and disposal, and flight line work phasing to minimize impact to active operations. Project will be design-bid-build (DBB).
NAICS Code: 237120. In accordance with DFARS 236.204, the magnitude of construction is anticipated to be between $25,000,000 and $100,000,000. General period of performance is anticipated to be approximately 722 calendar days. A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement as described in 29 U.S.C. 158 (f).
Federal Acquisition Regulation (FAR) policy states: Executive Order (E.O.) 14063, Use of Project Labor Agreements for Federal Construction Projects, requires agencies to use PLAs in large-scale construction projects (defined as a construction projects with a total estimated cost at or above $35M) to promote economy and efficiency in the administration and completion of Federal construction projects.
When awarding a contract in connection with a large-scale construction project, agencies shall require use of a PLA for contractors and subcontractors engaged in construction on the project, unless an exception(s) at FAR 22.504(d) applies. Reference is made to:
FAR Subpart 22.5 Use of Project Labor Agreements for Federal Construction Projects; provision, FAR 52.222-33 Notice of Requirement for Project Labor Agreement; and to clause, FAR 52.222-34 Project Labor Agreement. In consideration of the above factors, and any others which may be deemed appropriate, the public is invited to provide responses on the use of a PLA for this construction project utilizing the attached questionnaire.
This is not an announcement of the availability of a solicitation nor is it a means of generating a plan holder’s list. This survey is for planning purposes only and shall not be construed as a Request for Proposal or as an obligation on the part of the Government. The Government does not intend to award a contract on the basis of this market survey or otherwise pay for the requested information. The Government will not provide a debriefing on the results of this survey. All information will be held in a confidential manner and will only be used for the purposes intended.
Submission Instructions: Responses shall be submitted on the attached questionnaire via email to kathleen.b.maurer.civ@us.navy.mil and jodus.d.hortin.civ@us.navy.mil no later than 12:00 p.m. PDT, 13 September 2024. Please title the subject line of your e-mail as “(Insert Company Name) – P273 PLA RFI Questionnaire – N4425524RF016”. Emails can be no larger than 5 MB in size. If more than 5 megabytes are needed, more than one email may be sent.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 29, 2024
Sources sought
Due September 13, 2024 at 3:00 PM EDT. SAM.gov, notice dab5651e94a34f609e24697e258f75bc
Points of contact
- Katie Maurerkathleen.b.maurer.civ@us.navy.mil
- Jodus Hortinjodus.d.hortin.civ@us.navy.mil(360) 315-8317